Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | L1 | Accepted-AOC Lowest Quatation | |
| 2 | L2₹16.4 L+₹20,819 (1.28%)Rejected-Finance | L2 | Rejected-Finance Highest Quatation |
| Sl No | Description | Qty | Unit | A.G.Iyappan L2 | Aravinth L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 B | 43.4 | m3 | 187 ₹8,115.8 | 182 ₹7,898.8 Lowest |
| 2.00 | Collection supply and filling of Stone Dust filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 59.68 | m3 | 605 ₹36,106.4 | 593 ₹35,390.24 Lowest |
| 3.00 | Cement concrete of mix 1:4:8 (One cement Four sand and Eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification. | 59.68 | m3 | 6,389 ₹3,81,295.52 | 6,368 ₹3,80,042.24 Lowest |
| 4.00 | Plain Cement concrete of mix 1;2;4-One cement Two sand and Four aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification. | 141.96 | m3 | 7,570 ₹10,74,637.2 | 7,470 ₹10,60,441.2 Lowest |
| 5.00 | Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting | 284 | m2 | 465 ₹1,32,060 | 451 ₹1,28,084 Lowest |
| 6.00 | Cost and supply and fixing of Bitumen pad 12mm thick for expansion joint including cost of all labour charges etc complete | 23.04 | m2 | 491 ₹11,312.64 | 471 ₹10,851.84 Lowest |
Tender Value
₹19.5 L
EMD Value
₹19,500
Closing Date
25 Sept 2025, 3:00 pmClosed
Executive Officer
Executive Officer Killai TP
Providing Cement concrete road at Mannady street and Relaying of cement concrete road at Godown street in Killai Town Panchayat
2025_DTP_607314_1
142/2025/A1
Open Tender
Civil Works
Works
90 days
Killai TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,500
Yes
20 Jan 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 B
Collection supply and filling of Stone Dust filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete.
Cement concrete of mix 1:4:8 (One cement Four sand and Eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification.
Plain Cement concrete of mix 1;2;4-One cement Two sand and Four aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification.
Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting
Cost and supply and fixing of Bitumen pad 12mm thick for expansion joint including cost of all labour charges etc complete
A.G.Iyappan (BID ID -1469350)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .