| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹19.7 L+₹2.4 L (14.2%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹20.3 L+₹3.1 L (17.8%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.4 L
EMD Value
₹20,000
Closing Date
1 Jul 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
REPLACEMENT OF 100 MVA 220/132KV TRANSFORMER (CGLMAKE) WITH 160MVA 220/132KV TRANSFORMER (BHELMAKE) ALONGWITH OTHER ASSOCIATED WORKS AT 220KV S/S AMETHI UNDER ETD, SULTANPUR
2022_UPTCL_709355_1
S.T. T.No. 18/ETCS/2022-23
Open Tender
Electrical Works
Item Wise
30 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
SE ETC Sultanpur
₹20,000
5 Jul 2022
20 Jun 2022
2 Jul 2022
20 Jun 2022
1 Jul 2022
20 Jun 2022
180 days
Amount
Replacement of 100MVA 220/132KV Transformer (CGL make) with 160MVA 220/132KV Transformer (BHEL make) at 220KV Sub Station Amethi , alongwith other associated Works at 220KV Sub Station Amethi, with all Cost of Men, Misc. Consumables, T&Ps, Crane / Hydra, Centrifuging Machine, CFM Operator, CFM Lubricant etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below :
Draining of Oil from 100MVA CGL make Transformer at 220KV Sub Station Amethi into 209 Liter Capacity Oil Drums.
Dismantling of existing 132KV LAs alongwith associated structures Installed in 100MVA 220/132KV transformer bay after due cutting of earthing, opening of jumpers etc. (1 Job per L.A. with structure)
Complete dismantling of all the water & air pipe lines, pipe supports etc. of Emulsifire system around the 100MVA 220/132KV Transformer alongwith Shifting & Stacking of all the dismantled Items at safe storage place at the sub station.
Opening of HV & LV side jumpers, removal of neutral & main tank earthing, and opening of control & power cable connections of the 100MVA 220/132KV Transformer including opening of connections of associated OLTC & Marshalling box.
Complete dismantling of the accessories of the 100MVA 220/132KV Transformer including opening of jumpers, removal of earthing, opening of cable connections, draining out the transformer oil up to required level in 209 liter. capacity oil drums, removal of conservator tank, radiators, pipe lines, bushings etc. after draining of oil in radiators, cooling fans, marshalling box, etc., then fixing of blanking plates on the radiators, pipe lines, conservator tank turret etc. (blanking plate including bolts & nuts, as required and not available shall be provided /arranged by the contractor)
Shifting & proper stacking of all the dismantled Items of the 100MVA 220/132KV Transformer i.e. conservator tank, pipe lines, bushings, cooling fans & pumps, marshaling box, radiators, headers, 'A' frame, T/F oil in drums etc. at safe storage place at the sub station.
Proper packing of HV / LV neutral bushings of the dismantled 100MVA 220/132KV Transformer in separate wooden cases / crates of the bushings after proper wrapping of bushings with polythene sheet alongwith repairing of wooden cases / crates, as required.
(A) Shifting of main tank of the dismantled 100MVA (CGL Make) 220/132KV Transformer from the plinth upto 20 meter distance including turning of the tank, as required.
(B) Additional Shifting of the tank of above transformer upto 200 meter distance. (1 Job for every 5 meter and / or part there of)
(A) Shifting of Main Tank of the 160MVA (BHEL Make) 220/132KV Transformer to its Plinth from Place of Unloading upto 20 Meter Distance including Turning of the Tank, as Required.
(B) Additional shifting of the tank of above Transformer upto 100 Meter distance. (1 Job for every 5 meter and / or part there of)
Complete erection of the 160MVA (BHEL Make) Transformer including its radiators, conservator tank, turrets, connecting pipe lines, HV / LV / neutral bushings, cooling fans, OLTC drive mechanism box, marshaling ox, OTI, WTI, capillary tubes etc.
Supply of dry Nitrogen gas having DEW point (-60 gc to -65 gc) under vacuum from top valve of the transformer upto pressure of 2PSI (as per technical norms of Transformer) and maitaining the same in the main tank for 12Hrs. including cost of nitrogen gas and nitrogen gas filling device for dry cycle.
Create the vacuum inside the T/F tank & maintain it for 24 Hrs. dry air cycle of T/F creating vacuum inside the main tank of T/F , maintaining it for 24 Hrs. then filling of dry air bearing dew point (-60˚C to -65˚C) for 24 Krs. And repeating the same till the PPM value of main tank is achieved below 05PPM filling the oil step by step in 160MVA T/F.
Centrifuging of completed T/F oil in T/F oil tank by connecting centrifuging machine to be provided by the contractor and taking the BDV & IR values of the oil periodically till the require value in achieved as per direction of Supervising Engineer (Centrifuging machine shall be arranged by the contractor ). After centrifuging of PPM & DGA test of oil sample is to be carried out.
Carriage of oil tank of 20KL (02 No's) capacity from 400KV S/S Sultanpur to 220KV S/S Amethi distance upto 40KM including loading and unloading at respective place and after work completion Carriage of oil tanks of 20KL (02No's) from 220kV S/S Amethi to 400kV S/S Sultanpur .
Delta earthing of 160MVA Transformer consisting of fabrication of delta set with 03 Nos. 40mm/33mm dia size 03 Mtr. Long electrode, its placing inside ground and connecting all the these electrode with 75x10mm M.S. Flat 700mm deep and connecting the same with earthmate at two places. The work also to be done for painting the welding joint in black colour below earth level and green colour above ground level in two coats. (M.S. Rods & M.S.Flat will be provided by the department free of cost.)
Erection of 132KV LAs including erection of associated ALP structures, earthing of the LAs with existing M.S. flat and jumpering with ACSR moose conductors to connect with 132KV jack bus with the help of ACSR moose conductor, associated terminal connectors, P.G. clamps etc. (1 job per L.A. with associated structure)
Jumpering of HV side bushings of the 160MVA transformer to connect with HV side CTs through 220KV LAs with ACSR Zebra conductor, associated terminal connectors etc.
Jumpering of LV side bushings of the 160MVA Transformer to connect with LV side CT's through 132KV LA's with the help of ACSR Zebra conductor, associated terminal connectors, P.G. clamps etc.
Making terminations / connection of the control & power cables as per new cable schedule of 160MVA Transformer, RTCC panel, control & relay panel, cooling fans, pumps, marshalling box, OLTC driving mechanism etc. using existing cables including laying new cables (approx 03 KM), dressing & binding of additional control cables, if required as per site requirement alongwith making necessary holes in the gland plate / box, wherever required including providing & fixing of cable glands of appropriate sizes, providing of ferrules etc.
Conductiong test of 160 MVA T/F (M/S BHEL Make) by arranging appropriate equipements for following items:- 1. WRM-01 No. 2. Tan delta-02 No.(Pre-erection and post-erection) 3. Turret CT Ratio. Polarity, knee Point continuity & I.R. Test.
Following works are to be carried out for supply & by using old installation, erection, hydraulic testing & commisioning of water spraying & fire detection Emulsifire system on 160 MVA 220 / 132 KV T/F BHEL make, its connection with existing Emulsifire pipe lines and other associated works at 220 K.V. S/S Amethi with all cost of men, material & misc. consumables, T&P etc. to complete the job satisfactorily :
By using old & used pipes of dismentalled old Emulsifire system of removed defective 160 MVA T/F (CGL make) including cutting,welding etc.
25 mm.dia. G.I. Pipe
50 mm.dia. G.I. Pipe
65 mm.dia. G.I. Pipe
80 mm.dia. G.I. Pipe
100 mm.dia. G.I. Pipe
150 mm.dia. G.I. Pipe
Installation of HV nozzle projector
Installation of HV HD fire Detector
Providing, laying, installation, testing & commissioning of new G.I. pipe 'B' Class including cutting,welding etc.and providing suitable Flangs alongwith necessary fitting viz bends,elbow,tees,reducer,gaseket etc including 5 % wastages .
25 mm.dia. G.I. Pipe
50 mm.dia. G.I. Pipe
65 mm.dia. G.I. Pipe
80 mm.dia. G.I. Pipe
Supply ,installation of HV nozzle project HD make.
Supply ,installation ,testing & commissioning of sprinkler.
Double flanged Sluice Valve 150 mm dia.
Double coat painting of Emulsifire pipe lines on 160MVA T/F BHEL make by Red ,Blue & Black colours (Super enamel paint) after single coat primer ,painting shall be done in proper interval.
Omurmila Constructions
Gupta Elect and Engg Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .