| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC Due to L1 Bidder | |
| 2 | L2₹9.6 L+₹31,071.46 (3.33%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹9.7 L+₹34,622.48 (3.71%)Rejected-Finance N A | NA | NA | 121004 | L3 | Rejected-Finance Due to L3 |
Tender Value
₹8.9 L
EMD Value
₹8,877
Closing Date
24 Aug 2026, 9:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for providing 11kv HT Line,11/0.4kv,63 KVA Sub-Station for SOP to Sub-Tehsil Office Building at village Bihru Kalan Bid No- UED/83/2026-27 under ESD HPSEBL Thanakalan.
2026_HPSEB_141130_1
BID NO- UED/83/2026-27
Open Tender
Electrical Works
Percentage
90 days
Sub-Tehsil Office Building at village Bihru Kalan
AS PER SBD
6 documents required · 6 mandatory
₹590
₹8,877
22 Sept 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | A) Erection Part | - | - | - | - |
| 1.02 | 11kV HT Line | - | - | - | - |
| 1.03 | Erection of S.T Single Pole Str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect. | 5 | Each | 4,857 | ₹24,285 |
| 1.04 | Erection of Double Str Pole Str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect. | 1 | Each | 10,167 | ₹10,167 |
| 1.05 | Erection of 4 Pole Str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect. (Existing 2 Pole + Proposed 2 Pole = 2 Pole Str.) | 1 | Each | 10,167 | ₹10,167 |
| 1.06 | Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect. | 1.15 | Per Wire /Per Km | 19,911 | ₹22,977.29 |
| 1.07 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. | 0.79 | Kms | 4,078 | ₹3,201.23 |
| 1.08 | Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. | 9 | Nos | 1,434 | ₹12,906 |
| 1.09 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. | 18 | Nos | 1,883 | ₹33,894 |
| 1.1 | Erection iof GO/DO Fuse Switch | 4 | Nos | 1,500 | ₹6,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_209476.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .