Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹47.5 LAccepted-AOC 56 89 WARD NO 17 PARASIA POST PARASIA DISTRICT CHHINDWARA M P | PARASIA | CHHINDWARA | MADHYA PRADESH | L-1 | Accepted-AOC Successful Bidder | |
| 2 | L-2₹49.2 L+₹1.6 L (3.43%)Rejected-Finance KARMA COLONY MINERS GUDI POST PALACHOURI DISTRICT CHHINDWARA M P | DUNGARIYA | CHHINDWARA | MADHYA PRADESH | 480553 | L-2 | Rejected-Finance Unsuccessful Bidder | |
| 3 | L-3₹49.5 L+₹1.9 L (4.10%)Rejected-Finance 48 SHANKAR NAGAR PARATALA CHHINDWARA POST CHHINDWARA DISTRICT CHHINDWARA M P | CHHINDWARA | CHHINDWARA | MADHYA PRADESH | L-3 | Rejected-Finance Unsuccessful Bidder | |
| 4 | L-4₹50.6 L+₹3.1 L (6.50%)Rejected-Finance EKLEHARA COLONY PO EKLEHARA DISTT CHHINDWARA M P | L-4 | Rejected-Finance Unsuccessful Bidder | |
| 5 | L-5₹51.6 L+₹4.1 L (8.61%)Rejected-Finance GUDI KARMVEER COLONY POST GUDI TEHSIL JUNNARDEO DISTRICT CHHINDWARA M P | GUDI | CHHINDWARA | MADHYA PRADESH | L-5 | Rejected-Finance Unsuccessful Bidder |
Tender Value
₹79.0 L
EMD Value
₹99,000
Closing Date
10 Jul 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Construction of boundary wall around Sharda UG Mine under Ambara Sub Area.
2023_WCL_281662_1
ka3450-civ-s-e004 of 2023-24
Open Tender
Civil Works - Buildings
Item Rate
150 days
Sharda UG Project
As per NIT
6 documents required · 6 mandatory
₹99,000
26 Aug 2023
16 Jun 2023
11 Jul 2023
17 Jun 2023
10 Jul 2023
17 Jun 2023
17 Jun 2023 - 8 Jul 2023
Amount
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts.
Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand).
Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in superstructure above plinth level up to floor one level in: Cement mortar 1:6 (1 cement : 6 coarse sand).
12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand).
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Supplying at site : R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earthworks in excavation, concrete works in foundation to be paid separately).
Fencing with angle iron post placed at required distance embeded in cement concrete blocks / cement concrete by barbed wire 9.38 kg per 100 m (minimum) between the two posts / strut fitted and fixed with GI staples etc complete. (Cost of posts, struts and concrete work to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used: With G.I. barbed wire.
Providing and fixing concertina coil fencing with required dia 600 mm upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. Stud tied with G.I. Staples and G.I. Clips to retain horizontal including necessarybolts or G.I. Barbed wire tied to angle iron all complete as per direction of Engineer-in-charge with reinforced barbed tape (R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg / sqmm with tape (0.52 mm thick) of Supreme make or equivalent and weight 43.478 gm / metre (cost of M.S. Angle, C.C. Blocks shall be paid separately).
Total impact of GST for the purpose of CTC
RAJPOOT CONSTRUCTION
MEER CONSTRUCTION
M/S KGN CONSTRUCTION
High Tech Infrastructure
Tirupati Construction Company
stage.html
html • 0.06 MB
technical_291639.pdf
PDF • 0.31 MB
techsummary_291639.pdf
PDF • 0.39 MB
finance_291639.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_291639.pdf
PDF • 0.26 MB
AL-e-04-23-24.pdf
PDF • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .