| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹33.4 L+₹1.0 L (3.22%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹33.5 L+₹1.2 L (3.70%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹33.7 L+₹1.3 L (4.15%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹33.9 L+₹1.5 L (4.77%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹48.8 L
EMD Value
₹97,560
Closing Date
9 Mar 2026, 12:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Boundary Wall at river side /back side of Yatra Camp Shadipora
2026_PWDJK_304872_3
NIT NO 88 OF 2025-26 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
30 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division
₹97,560
10 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: ( All kinds of soil) | 215.44 | Cum | 479.3 | ₹1,03,260.39 |
| 2 | P/L dry stone soling close packed including carriage complete job | 27.88 | Cum | 1,000 | ₹27,880 |
| 3 | P/L cast in situ M-7.5 (1:4:8) PCC with 40mm niminal size crushed stone agg.excluding cost of centering and shuttering. All work up to plinth level incl. carriage. | 17.55 | Cum | 5,202.9 | ₹91,310.9 |
| 4 | Providing and fixing in position cement concrete M-15 (1:2:4) with 20mm nominal size crushed stone agg. excluding cost of centering and shuttering. All work up to plinth level incl. carriage. | 283.48 | Cum | 6,591.2 | ₹18,68,473.38 |
| 5 | Centring and shuttering including strutting, propping etc and removal of form work:-Foundation | 588 | sqm | 286.35 | ₹1,68,373.8 |
| 6 | Structural steel work riveted , bolted or welded in built up sections , trusses and frame work , incl. cutting hoisting and fing in position and applying a priming coat of approved steel primer and paint all complete. | 13,808.61 | Kg | 120.8 | ₹16,68,080.09 |
| 7 | Providing & fixing 0.50mm corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated long J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.( From TATA / JINDAL) | 972 | Sqm | 852.5 | ₹8,28,630 |
| 8 | carriage of sand 5 km by mechnical transport | 129.44 | cum | 200.74 | ₹25,983.79 |
| 9 | Stone agg. from for an avg lead of 15 km | 267.92 | cum | 344.44 | ₹92,282.36 |
| 10 | carriage of steel 5 km by mechnical transport | 13.81 | MT | 178.43 | ₹2,464.12 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_990289.xls
BOQ • 0.42 MB
corg88.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .