Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance | -39.90% | ₹9.1 L | L1 | Admitted-Finance |
| 2 | L2₹9.4 L+₹28,809.53 (3.18%)Admitted-Finance | -37.99% | ₹9.4 L+₹28,809.53 (3.18%) | L2 | Admitted-Finance |
| 3 | L3₹9.5 L+₹45,853.91 (5.06%)Admitted-Finance | -36.86% | ₹9.5 L+₹45,853.91 (5.06%) | L3 | Admitted-Finance |
| 4 | L4₹10.2 L+₹1.1 L (12.3%)Admitted-Finance | -32.50% | ₹10.2 L+₹1.1 L (12.3%) | L4 | Admitted-Finance |
| 5 | L5₹10.4 L+₹1.3 L (14.3%)Admitted-Finance | -31.32% | ₹10.4 L+₹1.3 L (14.3%) | L5 | Admitted-Finance |
Tender Value
₹15.1 L
EMD Value
₹30,160
Closing Date
4 May 2026, 5:00 pmClosed
Office of the Executive Engineer PMGSY Div Budhal
Office of the Executive Engineer PMGSY Div Budhal
Permanent Restoration of road from L025 Lower Planger to Badhnoo Part-II, Pkg No. JK12-501, Length 06.10 Kms
2026_JKRRD_147398_2
EE/PMGSY/B /06 Date.28.04-2026
Open Tender
CIVIL
Percentage
budal
Permanent Restoration of road from L025 Lower Planger to Badhnoo Part-II, Pkg No. JK12-501, Length
06.10 Kms
2 documents required · 2 mandatory
₹600
Office of the Executive Engineer PMGSY Div Budhal
₹30,160
Yes
Office of the Executive Engineer PMGSY Div Budhal
9 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavating for structure as per drawings by mechical means ( hydrulic exacavator) in trenches for foundation of drains pipes cables etc ( not execeeding 1: 5 M in width ) and dressing of siders and ramnming of bottoms lift upto 1: m getting out exevated within lead of 50m in all kinds of soil | 178.01 | Cum | 256.85 | ₹45,721.87 |
| 2 | Providing and laying in position cement concrete of specified grade M10 including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.42 | Cum | 5,733.6 | ₹82,678.51 |
| 3 | Providing and laying in position cement concrete of specified grade M15 including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 42.36 | Cum | 6,591.25 | ₹2,79,205.35 |
| 4 | Providing and laying in position cement concrete of specified grade M20 including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.9 | Cum | 7,275.25 | ₹21,098.23 |
| 5 | Stone filling Hand packed in horizontal on level including coast of stone behind R/Wall | 108 | cum | 937.9 | ₹1,01,293.2 |
| 6 | Rqaandom Rubble Mechinery with hard stone in foundation and plinth including levelling up with cement concrete 1:8:12 (cement:6 corse and : 12 graded stone aggrigrate 20mm nominal size) up to plinth level and curing complete with cement motor 1:6 (1 cement :6 coarse sand). | 93.52 | Cum | 5,402.97 | ₹5,05,285.75 |
| 7 | Dry random bubble massory with hard stone in foundation and plinth with bond stone B/ wall and r/wall | 51.45 | cum | 3,262.1 | ₹1,67,835.05 |
| 8 | Providing and making Gabion structure with mechanical woven double twisted hexagonal shaped wire mesh gabion boxes as per IS 16014:2012 Morth clause 2500 of required size 1m interval having wire per meter of mash as per drawing all complete as per direction of Engineers in charge complete job. | 69.12 | cum | 1,765.5 | ₹1,22,031.36 |
| 9 | Providing laying, non pressure pipes of specified class Rcc pipes including collars spiogt jointed with stiff mixture of cement motor in proprotion of 1:2 (1 cement 2 Fine sand Rcc Pipes 600mm dia piupes | 10 | RMT | 2,415.8 | ₹24,158 |
| 10 | Contering and shguttering including shuttering propping etc and removal of work for foundation footing bases for columns drains without slabs. | 8.4 | cum | 286.35 | ₹2,405.34 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_229900.xls
BOQ • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .