| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.3 LAdmitted-Fee/PreQual/Technical/Finance | -6.20% | ₹27.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹29.1 L+₹1.8 L (6.61%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.1 L+₹1.8 L (6.61%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹32,944
Closing Date
23 Jul 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
BRAHMAPUR, ODISHA, 760002
Construction of 4 nos community hall in wn-37 MSBY
2026_ORULB_134208_36
BeMC(BAM)/328/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹32,944
Yes
27 Jul 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation in foundation in ordinary soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | 81.72 | CUM | 200.7 | ₹16,401 |
| 2 | Filling in foundation and plinth with sand watered and rammed including cost of sand & labour | 62.92 | CUM | 1,553.39 | ₹97,739.3 |
| 3 | Cement concrete (1:4:8) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete | 21.6 | CUM | 5,748.17 | ₹1,24,160.47 |
| 4 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.(including centering & shuttering etc complete) | 17.61 | CUM | 6,603.73 | ₹1,16,278.48 |
| 5 | plinth beam | 3.96 | CUM | 7,371.69 | ₹29,191.89 |
| 6 | column | 2.02 | CUM | 7,371.69 | ₹14,890.81 |
| 7 | lintel | 3.96 | CUM | 13,272.12 | ₹52,557.6 |
| 8 | roof slab | 18.2 | CUM | 13,272.12 | ₹2,41,552.58 |
| 9 | chaja | 14.4 | CUM | 1,135.06 | ₹16,344.86 |
| 10 | Fly ash brick masonary in F&P using cement mortar (1:6) | 36.08 | CUM | 5,509.03 | ₹1,98,765.8 |
stage.html
html • 0.02 MB
finance_600128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 1.60 MB
BOQ_600128.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .