| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-Finance VILLAGE URU P O SHINGLA TEHSIL RAMPUR DISTT SHIMLA | 1 | Accepted-Finance Lowest bidder | |
| 2 | 2₹5.5 L+₹12,231.25 (2.29%)Rejected-Finance VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | 2 | Rejected-Finance High bid | |
| 3 | 3₹5.6 L+₹21,387.50 (4.00%)Rejected-Finance | 3 | Rejected-Finance Highest bid |
| Sl No | Description | Qty | Unit | M/S Satya Dev L3 | M/S KEDAR BHALUNI L2 | M/s Prabhu Dyal L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 16.25 | Cum. | 450 ₹7,312.5 | 425 ₹6,906.25 | 380 ₹6,175 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8(1Cement: 4Sand: 8Graded stone agg.20mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | 6.25 | cum | 8,200 ₹51,250 | 8,400 ₹52,500 | 8,000 ₹50,000 Lowest |
| 3.00Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | ||||||
| 3.01 | In Columns, Pillars post and struts. | 25 | Cum | 12,000 ₹3,00,000 | 11,700 ₹2,92,500 | 11,500 ₹2,87,500 Lowest |
| 4.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 4.01 | In Columns, Pillars post and struts. | 100 | Sqmt. | 500 ₹50,000 | 490 ₹49,000 | 480 ₹48,000 Lowest |
| 5.00 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 1,500 | kg | 98 ₹1,47,000 | 97 ₹1,45,500 | 95 ₹1,42,500 Lowest |
Tender Value
₹4.9 L
EMD Value
₹9,791
Closing Date
24 Mar 2026, 5:00 pmClosed
EE Rampur
JSD Rampur
ARMO to GWSS Rampur Town phase 1st in tehsil Rampur
2026_HPIPH_131831_1
EE-JSD-RMP-E-Ten/25-16302-52 dt 16.03.2026
Open Tender
Civil Works
Item Rate
60 days
Rampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹9,791
15 Oct 2026
17 Mar 2026
25 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 2Providing and laying cement concrete 1:4:8(1Cement: 4Sand: 8Graded stone agg.20mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | |||||
| 3Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | |||||
| 3.01 | In Columns, Pillars post and struts. | - | Cum | - | - |
| 4Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | |||||
| 4.01 | In Columns, Pillars post and struts. | - | Sqmt. | - | - |
| 5Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_194947.xls
BOQ • 0.27 MB
F6.pdf
Tender Documents • 0.65 MB
F8.pdf
Tender Documents • 1.08 MB
TC.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .