| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance BAHIRTAFA JADURBERIA ULUBERIA HOWRAH | ULUBERIA | HOWRAH | WEST BENGAL | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.0 LAdmitted-Finance | ₹9.0 L | L2 | Admitted-Finance |
| 3 | L3₹9.0 LAdmitted-Finance | ₹9.0 L | L3 | Admitted-Finance |
Tender Value
₹8.9 L
EMD Value
₹20,000
Closing Date
24 Jan 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
REMOVAL OF SILT FROM NIKASHI DRAIN OF WARISH NAGAR, NIMTALA GATE AND ITS ADJACENT AREA IN WARD NO. 141 UNDER BR. XV
2026_KMC_988856_1
S_D/S-I/XV/141/63A/25-26
Open Tender
CIVIL WORKS
60 days
WARISH NAGAR, NIMTALA GATE AND ITS ADJACENT AREA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
11 Feb 2026
16 Jan 2026
27 Jan 2026
16 Jan 2026
24 Jan 2026
16 Jan 2026
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts.
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.32.Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as
MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d)Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable. (6th Corrigenda & addenda dated 29.07.2019)
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
Removal of silt, slush, musks or any other foul materials from covered nikashi / box drain of any size and depth by any method approved of impure / inflammable /asphyxiating gases from the drains etc. with staging if necessary, stacking of the materials properly away from traffic lane as far as practicable lead upto 75 mtr. with all labour and materials and hire charges of tools and plants as per direction of Engineer-in-Charge. For Covered Nikashi or Box Drain.Transportation of silt, slush or other foul materials from the working site anddisposal of the same beyond the area of Municipal Corporation / Municipality/ Notified Area Authority / Industrial Township Authority including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. complete (Land for disposal to be arranged by the contractor).(Payment to be made on the basis of stack measurement after deducting sinkage/shrinkage at the rate of 1/9th of volume). For Day :
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Add: 0%SGST
Add: 0%CGST
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_2415914.xls
BOQ • 0.29 MB
form.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid