Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹383.0 Cr+₹12.1 Cr (3.17%)Accepted-AOC | L2 | Accepted-AOC Rate acceptted | |
| 2 | L1₹383.6 CrRejected-Finance 5TH FLOOR JMD EMPIRE SECTOR 62 GOLF COURSE EXTENSION ROAD GURUGRAM HARYANA 122103 | GURUGRAM | GURUGRAM | HARYANA | 122103 | L1 | Rejected-Finance Disqualified vide TAC decision dated 19.03.2021 | |
| 3 | L3₹396.2 Cr+₹12.6 Cr (3.29%)Rejected-AOC PLOT NO 137 2ND FLOOR AVTAR ENCLAVE PASCHIM VIHAR NEW DELHI 110063 | WEST | DELHI | 110063 | L3 | Rejected-AOC Higher Rates | |
| 4 | L4₹410.2 Cr+₹26.6 Cr (6.92%)Rejected-AOC 650 CIC CAMPUS JHOKAN BAGH JHANSI U P | JHANSI | JHANSI | UTTAR PRADESH | 284001 | L4 | Rejected-AOC Higher Rates | |
| 5 | L5₹449.5 Cr+₹65.9 Cr (17.2%)Rejected-AOC | L5 | Rejected-AOC Higher Rates |
| Sl No | Description | Qty | Unit | Shivalaya Construction Co. Pvt. ltd L3 | KCC Buildcon Pvt Ltd L1 | Kunal Structure (India) Pvt. Ltd. L2 | Ghanaram Infraengineers Private Limited L4 | SCC Infrastructure Pvt. Ltd. L5 | Gawar Construction Limited L6 | RAMALINGAM CONSTRUCTION COMPANY PRIVATE LIMITED L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Works Details | ||||||||||
| 1.10 | Dismentelling Brick work masonary in cement for Hydraulic work (HSR item No. 8.5(b) | 3,24,976.48 | Cum (Per cubic meter) | 300 ₹9,74,92,944 | 350 ₹11,37,41,768 | 230 ₹7,47,44,590.4 | 500 ₹16,24,88,240 | 155 ₹5,03,71,354.4 Lowest | 200 ₹6,49,95,296 | 320 ₹10,39,92,473.6 |
| 2.00 | Dismentelling of RCC work with cleaning, straighting & Cutting of bars if required (HSR item No. 8.6 (e) | 8,326.26 | Cum (Per cubic meter) | 703 ₹58,53,360.78 | 850 ₹70,77,321 | 689 ₹57,36,793.14 | 1,100 ₹91,58,886 | 310 ₹25,81,140.6 | 200 ₹16,65,252 Lowest | 645 ₹53,70,437.7 |
| 3.00 | Dismentelling CC 1:4:8 (Hydraulic work) (HSR item No. 8.6 (b) | 51,092.37 | Cum (Per cubic meter) | 300 ₹1,53,27,711 | 450 ₹2,29,91,566.5 | 305 ₹1,55,83,172.85 | 600 ₹3,06,55,422 | 310 ₹1,58,38,634.7 | 200 ₹1,02,18,474 Lowest | 340 ₹1,73,71,405.8 |
| 4.00 | Dismentelling CC 1:3:6 (HSR item No. 8.6 (c) | 63,224.65 | Cum (Per cubic meter) | 333 ₹2,10,53,808.45 | 400 ₹2,52,89,860 | 398 ₹2,51,63,410.7 | 600 ₹3,79,34,790 | 310 ₹1,95,99,641.5 | 200 ₹1,26,44,930 Lowest | 306 ₹1,93,46,742.9 |
| 5.00 | Dismentelling of Arch work in cement Hydrolic work (HSR item No. 8.5 © | 1,722.71 | Cum (Per cubic meter) | 430 ₹7,40,765.3 | 500 ₹8,61,355 | 368 ₹6,33,957.28 | 600 ₹10,33,626 | 310 ₹5,34,040.1 | 200 ₹3,44,542 Lowest | 398 ₹6,85,638.58 |
| 6.00 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 60 mtrs. Including dressing HSR item No.6.2(b) i&ii.&6.3 | 36,96,089.63 | %Cum (Per 100 cubic meter) | 3,625 ₹13,39,83,249.09 Lowest | 5,250 ₹19,40,44,705.57 | 4,316 ₹15,95,23,228.43 | 5,000 ₹18,48,04,481.5 | 10,078 ₹37,24,91,912.91 | 4,000 ₹14,78,43,585.2 | 5,500 ₹20,32,84,929.65 |
| 7.00 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 5 KM . ( long lead) Including dressing HSR item No.5.2(b)+4.1 (i).&6.3 | 28,26,381 | Cum (Per cubic meter) | 220 ₹62,18,03,820 | 140 ₹39,56,93,340 | 61 ₹17,24,09,241 Lowest | 190 ₹53,70,12,390 | 132 ₹37,30,82,292 | 300 ₹84,79,14,300 | 175 ₹49,46,16,675 |
| 8.00 | Extra for compaction of E/W as per specification (HSR item No.6.2(g)I,iii & v | 7,20,948.39 | %Cum (Per 100 cubic meter) | 1,700 ₹1,22,56,122.63 | 850 ₹61,28,061.32 Lowest | 2,067 ₹1,49,02,003.22 | 1,200 ₹86,51,380.68 | 1,860 ₹1,34,09,640.05 | 1,200 ₹86,51,380.68 | 1,225 ₹88,31,617.78 |
| 9.00 | Rehandling of earth work with an average lead of 15 mtr. 80% of HSR 6.2 (b ) I,ii | 26,702 | %Cum (Per 100 cubic meter) | 3,480 ₹9,29,229.6 | 2,800 ₹7,47,656 | 3,086 ₹8,24,023.72 | 3,500 ₹9,34,570 | 3,876 ₹10,34,969.52 | 54 ₹14,419.08 Lowest | 3,500 ₹9,34,570 |
Tender Value
₹323.6 Cr
EMD Value
₹6.5 Cr
Closing Date
2 Feb 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Indri W/S Division, karnal
Executive Engineer, Indri W/S Division, The Mall Road, Karnal
Remodeling of Augmentation Canal from Km 0 to 75.250 i.e. from Hamida Head to Picholia Head(Merging Point with WJC Main Branch)
2021_HRY_155261_1
14/33-A Dt. 01/01/2021
Open Tender
Civil Works
Item-rate/Agreement basic
705 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹6.5 Cr
Yes
Karnal
22 Mar 2021
5 Jan 2021
5 Feb 2021
5 Jan 2021
2 Feb 2021
5 Jan 2021
5 Jan 2021 - 15 Jan 2021
15 Jan 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works Details | |||||
| 1.1 | Dismentelling Brick work masonary in cement for Hydraulic work (HSR item No. 8.5(b) | 3,24,976.48 | Cum (Per cubic meter) | - | - |
| 2 | Dismentelling of RCC work with cleaning, straighting & Cutting of bars if required (HSR item No. 8.6 (e) | 8,326.26 | Cum (Per cubic meter) | - | - |
| 3 | Dismentelling CC 1:4:8 (Hydraulic work) (HSR item No. 8.6 (b) | 51,092.37 | Cum (Per cubic meter) | - | - |
| 4 | Dismentelling CC 1:3:6 (HSR item No. 8.6 (c) | 63,224.65 | Cum (Per cubic meter) | - | - |
| 5 | Dismentelling of Arch work in cement Hydrolic work (HSR item No. 8.5 © | 1,722.71 | Cum (Per cubic meter) | - | - |
| 6 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 60 mtrs. Including dressing HSR item No.6.2(b) i&ii.&6.3 | 36,96,089.63 | %Cum (Per 100 cubic meter) | - | - |
| 7 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 5 KM . ( long lead) Including dressing HSR item No.5.2(b)+4.1 (i).&6.3 | 28,26,381 | Cum (Per cubic meter) | - | - |
| 8 | Extra for compaction of E/W as per specification (HSR item No.6.2(g)I,iii & v | 7,20,948.39 | %Cum (Per 100 cubic meter) | - | - |
| 9 | Rehandling of earth work with an average lead of 15 mtr. 80% of HSR 6.2 (b ) I,ii | 26,702 | %Cum (Per 100 cubic meter) | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT.pdf
Tender Notice • 1.45 MB
BOQ_207856.xls
BOQ Document • 0.30 MB
71412488.pdf
Tender Document • 0.48 MB
71412490.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .