Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹383.0 Cr+₹12.1 Cr (3.17%)Accepted-AOC | L2 | Accepted-AOC Rate acceptted | |
| 2 | L1₹383.6 CrRejected-Finance BU 5 SFS FLATS OUTER RING ROAD PITAMPURA DELHI 110034 | DELHI | NORTH WEST DELHI | DELHI | 110034 | L1 | Rejected-Finance Disqualified vide TAC decision dated 19.03.2021 | |
| 3 | L3₹396.2 Cr+₹12.6 Cr (3.29%)Rejected-AOC PLOT NO 137 2ND FLOOR AVTAR ENCLAVE PASCHIM VIHAR NEW DELHI 110063 | WEST | DELHI | 110063 | L3 | Rejected-AOC Higher Rates | |
| 4 | L4₹410.2 Cr+₹26.6 Cr (6.92%)Rejected-AOC | L4 | Rejected-AOC Higher Rates | |
| 5 | L5₹449.5 Cr+₹65.9 Cr (17.2%)Rejected-AOC | L5 | Rejected-AOC Higher Rates |
Tender Value
₹323.6 Cr
EMD Value
₹6.5 Cr
Closing Date
2 Feb 2021, 5:00 pmClosed
Executive Engineer, Indri W/S Division, karnal
Executive Engineer, Indri W/S Division, The Mall Road, Karnal
Remodeling of Augmentation Canal from Km 0 to 75.250 i.e. from Hamida Head to Picholia Head(Merging Point with WJC Main Branch)
2021_HRY_155261_1
14/33-A Dt. 01/01/2021
Open Tender
Civil Works
Item-rate/Agreement basic
705 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹6.5 Cr
Yes
Karnal
22 Mar 2021
5 Jan 2021
5 Feb 2021
5 Jan 2021
2 Feb 2021
5 Jan 2021
5 Jan 2021 - 15 Jan 2021
15 Jan 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works Details | |||||
| 1.1 | Dismentelling Brick work masonary in cement for Hydraulic work (HSR item No. 8.5(b) | 3,24,976.48 | Cum (Per cubic meter) | - | - |
| 2 | Dismentelling of RCC work with cleaning, straighting & Cutting of bars if required (HSR item No. 8.6 (e) | 8,326.26 | Cum (Per cubic meter) | - | - |
| 3 | Dismentelling CC 1:4:8 (Hydraulic work) (HSR item No. 8.6 (b) | 51,092.37 | Cum (Per cubic meter) | - | - |
| 4 | Dismentelling CC 1:3:6 (HSR item No. 8.6 (c) | 63,224.65 | Cum (Per cubic meter) | - | - |
| 5 | Dismentelling of Arch work in cement Hydrolic work (HSR item No. 8.5 © | 1,722.71 | Cum (Per cubic meter) | - | - |
| 6 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 60 mtrs. Including dressing HSR item No.6.2(b) i&ii.&6.3 | 36,96,089.63 | %Cum (Per 100 cubic meter) | - | - |
| 7 | Earth excavation of ordinary soil including all leads & lifts with an avg. lead of 5 KM . ( long lead) Including dressing HSR item No.5.2(b)+4.1 (i).&6.3 | 28,26,381 | Cum (Per cubic meter) | - | - |
| 8 | Extra for compaction of E/W as per specification (HSR item No.6.2(g)I,iii & v | 7,20,948.39 | %Cum (Per 100 cubic meter) | - | - |
| 9 | Rehandling of earth work with an average lead of 15 mtr. 80% of HSR 6.2 (b ) I,ii | 26,702 | %Cum (Per 100 cubic meter) | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT.pdf
Tender Notice • 1.45 MB
BOQ_207856.xls
BOQ Document • 0.30 MB
71412488.pdf
Tender Document • 0.48 MB
71412490.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .