| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -9.89% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 CrAdmitted-Finance | +4.11% | ₹1.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance | +7.05% | ₹1.8 Cr | L3 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
16 Jun 2026, 9:30 amClosed
Executive Engineer, Regulation Division 1st, HMH
Executive Engineer, Regulation Division 1st, Hanumangarh (Rajasthan)
Repair and Renovation work of 5 Nos Escape Channel Gates at RD 165 of IGMN Including Super Structure and All Hoisting Asembly
2026_WRDAS_562864_1
EE/REG/01/2026-27
Open Tender
Civil Works - Canal
Percentage
365 days
RD 165 of IGMN
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Secretary, RREIS
₹3.4 L
Yes
Hanumangarh
24 Jun 2026
27 May 2026
16 Jun 2026
27 May 2026
16 Jun 2026
27 May 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift fix wheel type sliding gate/inter changeable Stop log gates consisting of skin plate, stiffeners, horizontal girders, pulley, pulley supports, bracings, lifting lug, bracket, rubber seals, clamps plates etc., with all accessories as per relevant for Canal, sluice Vertical gates and spillway gates including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, seal fixing, tools and tackles etc., finishing, cleaning, applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat(two coats)of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings complete, including packing & forwarding, transportation charges for structural steel components and other materials. | 26.5 | tonne | 1,76,935 | ₹46,88,777.5 |
| 1.02 | Design, Drawing, fabrication, supply, erection and commissioning of Trestle assy/ Railing decking/Trash rack/Structural steel hoist bridge/ structural steel hoist supporting structure for monorail / Catwalk bridge for connecting spillway piers for all type of sluice with embedded parts consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, ladder etc., with all other accessories for operating gates, other structure including cost of all materials, machinery, labour, tools and tackles, cutting, aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint etc., complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other materials. | 34.45 | tonne | 0.29 | ₹9.99 |
| 1.03 | Supply of water seal musical hollow knot type for canal gate having size 125x12x45 mm as per IS 11855 specification. | 65 | per mtr | - | - |
| 1.04 | Supply of water seal Flat type for canal gate having size 100x12 mm as per IS 11855 specification. | 22 | per mtr | - | - |
| 1.05 | Providing Casting machining and assembling of Cast Steel Rollers assembly complete with testing, including cost of all materials as Cast steel Rollers, Stainless steel Eccentric pin/shaft with square cut shape in one end for adjustment, Lock plate, bronze bush, cover plate, nut bolts, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, tools and tackles, including packing & forwarding, transportation charges for structural steel components and other materials. | 1,200 | kg | - | - |
| 1.06 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Adequate capacity manually operated rope drum hoist according to relevant IS code, consisting of hoist platform bridge, rope drums, connecting shaft, gear system unit, pulleys, wire rope, Gate position indicator, manual operation system, etc. complete, with all accessories for operating gates including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, oil filling, tools and tackles, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint etc., complete as per specifications and approved drawings, including packing & forwarding, transportation charges for all materials. | 65 | Per tonne capacity | - | - |
| 1.07 | Jungle clearance, ordinary including cutting bushes, shrubs and plants etc. for original earth work. | 2,550 | Per Square Meter | - | - |
| 1.08 | Uprooting Juli Flora /sarkanda
Uprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 1,537 | Per Square Meter | - | - |
| 1.09 | De-watering by pumping water to maintain desired level including cost of POL/ power consumption etc. complete.
10 to 19 HP | 18 | Per Hr. | - | - |
| 1.1 | Empty Cement (Polythene) Bags | 5,760 | Per Bag | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
biddoc165.pdf
Tender Documents • 2.59 MB
BOQ_1001706.xls
BOQ • 0.29 MB
corri01.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].