| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹75,521Accepted-Finance | 1 | Accepted-Finance Accept | |
| 2 | 2₹76,708+₹1,187 (1.57%)Accepted-Finance | 2 | Accepted-Finance Accept | |
| 3 | 3₹77,289+₹1,768 (2.34%)Accepted-Finance | 3 | Accepted-Finance Accept |
Tender Value
₹80,000
EMD Value
₹2,000
Closing Date
13 Apr 2022, 12:00 pmClosed
EE ETD FATEHGARH
EE ETD FATEHGARH, 132 KV S/S BEWAR ROAD FATEHGARH FARRUKHABAD-209602
REPLACING OLD AND OBSOLETE ACDB BY NEW ACDB AND ITS RELATED WOTK OF DISCONNECTING EXISTING POWER CABLE AND CONTROL CABLES AND ITS RETERMINATION TO NEW ACDB ALSO PROPER AC DISTRIBUTION IN 132/33 KV SWITCH YARD AT 132 KV S/S FATEHGARH UNDER ETD FTG
2022_UPTCL_681148_1
T-27/ETD(F)/2021-22
Open Tender
Electrical Works
Fixed-rate
90 days
FATEHGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
UPPTCL ETD FATEHGARH
₹2,000
16 Apr 2022
25 Mar 2022
13 Apr 2022
25 Mar 2022
13 Apr 2022
25 Mar 2022
Amount
Shifting new ACDB from stacking place to erection site, situated in 11 kv switch gear room, grouting of it through fastener and earthing of ACDB panel using 50x6 mm. M.S. flat with earth mat
Shifting one no. MLDB, power cable drum & Station T/F from 132 KV S/S Neebkarori to Fatehgarh work includes loading of 01 no. MLDB, 3.5 core 300 sq. mm. power cable drums, 3.5 core 50 sq. mm power cable drums & 33/0.4 KV Station T/F in truck by crane at 132 KV S/S Neebkarori. Carriage of above material from 132 KV S/S Neebkarori to 132 KV S/S Fatehgarh approx. 25 Km. and unloading them using hydra at 132 KV S/S Fatehgarh
Laying & Termination of following size PVC power cable from/to ACDB /MLDB installed in control room/Switchyard in side 500mm below ground level including excavation of trench & laying on its edge along with cable of both side filling the same with Ganga sand and then putting the bricks on 115mm side cover the trench & then filling with earth. Proper termination at both end by providing and crimping aluminium lugs as per requirement including cost of bricks, sand, as per cable schedule including carriage of cable drum from store and all other associated works.
Power cable 3.5 core x 300 mm2
Power cable 3.5 core x 50 mm2
300 mm2 Power cable termination.
50 mm2 Power cable termination.
Fixing grouting MLDB provide by department in 132 and 33 KV switchyard & its proper earthing by M.S. Flat
Laying & Termination of following size control cable in trench/cable tray from MLDB installed in switchyard to various equipments etc for providing AC to auxiliary in 132 KV and 33 KV switchyard & their termination.
2.5 Sq. mm. 2 core
Termination of newly laid and old disconnected from old ACDB to New ADCB/MLDB to various equipments at 132 KV and 33 KV Switchyard.
Dismantling old & damage ACDB by cutting, earthing, removing all old/spare power cable, control cable etc. shifting it from control room to store of S/S.
SAVITRI ENTERPRISES
anjana construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .