Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.4 LAdmitted-Finance | +3.00% | ₹20.4 L | L1 | Admitted-Finance |
Updated dates
Tender Value
₹19.8 L
EMD Value
₹39,628
Closing Date
28 Feb 2026, 3:00 pmClosed
Executive Engineer Electrical Division-3
ELECTRICAL DIVISION-3 SIRI FORT, BEHIND GARGI COLLEGE NEW DELHI-110049
Running Maintenance and Operation of Water Cooler and VRV/VRF system at NSSC Jasola.
2026_DDA_897703_1
70/EE(E)/ELD-3/DDA/2025-26
Open Tender
Electrical Works
365 days
As per tender doucument
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹39,628
Executive Engineer Electrical Division-3
20 Mar 2026
9 Feb 2026
2 Mar 2026
9 Feb 2026
28 Feb 2026
11 Feb 2026
11 Feb 2026
Comprehensive maintenance of VRV/VRF indoor and outdoor unit wich include all spare parts required for comrehensive maintenance of VRV/VRF unit as per Annexure- A and B.
Sub Head- VRV/VRF System Running and Operation of VRF System (ODUs and IDUs) by deploying one no. trained Technician in each shift (total 2 shifts) and one no. Khallasi in general shift for general maintenance and troubleshooting etc. complete as required. Details of installations of VRF System are given in and Annexure-A. Schedule of routine and preventive maintenance is given in Annexure-B.
Supplying and charging of R-22/R-410 Gas in the AC units including Pdg & fixing necessary copper piping, capillary tube including pressure testing, leak detecting and commissioning etc, complete required at site. a) 2.0 TR and 1.5 TR Split type AC units, Water Cooler, Window AC
Rewinding of fan motor of 2.0 TR Split type AC units and Water Cooler (capacity 150 Ltr) i/c replacement of gun metal bushes, testing, commissioning etc as required.
Supply & Replacement of 2 TR/1.5 TR Split AC, PCB Invertor Type complete with connection testing etc as required.
Supply and Replacement (i/c deduction of cost for replaced item) of condensing coil / cooling coil suitable for all type Split / Window AC (as per inventory) attached complete with connection testing etc as required.
Supply and replacement (i/c deduction of cost for replaced item) of copper piping for refrigerant flow (Liquid & gas) between indoor and outdoor unit of split AC complete with suitable insulation, tie rod, hanger etc. complete as required.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
NIT70.pdf
Tender Documents • 7.73 MB
BOQ_943580.xls
BOQ • 6.19 MB
Download all tender documents and submit your bid