| 1.00Construction of Waiting shed | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 18.83 | Cum | 280 ₹5,272.40 | 263.5 ₹4,961.71 |
| 1.02 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 5.39 | Cum | 5,550 ₹29,914.50 | 5,539.2 ₹29,856.29 |
| 1.03 | Refilling the basement with excavated earth other than sand complying the Standard specification | 6.46 | Cum | 70 ₹452.20 | 45.7 ₹295.22 |
| 1.04 | Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete. | 5.65 | Rm | 6,160 ₹34,804 | 6,148.6 ₹34,739.59 |
| 2.01 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm | 85.3 | Nos | 1,130 ₹96,389 | 1,095 ₹93,403.50 |
| 2.02 | Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1,000 | Kg | 100 ₹1 L | 91.7 ₹91,700 |
| 2.03 | R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 3.88 | Nos | 9,170 ₹35,579.60 | 9,150.1 ₹35,502.39 |
| 2.04 | For super structure | 3.55 | Nos | 9,170 ₹32,553.50 | 9,150.1 ₹32,482.86 |
| 3.01 | Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 53.2 | Cum | 340 ₹18,088 | 326.1 ₹17,348.52 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Dec 2025, 4:00 pmClosed
BDO (B.pt), Radhapuram
Block Development Office, Radhapuram
Construction of waiting shed Thoppuvilai Burial ground road in K.pudhur Panchayat in Radhapuram Panchayat Union
2025_RDTN_630794_1
SFC 2025-2026
Open Tender
Civil Works
Block Development Office, Radhapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
23 Dec 2025
10 Dec 2025
18 Dec 2025
10 Dec 2025
18 Dec 2025
10 Dec 2025
Amount
Construction of Waiting shed
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling the basement with excavated earth other than sand complying the Standard specification
Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
For super structure
Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three M Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required .
Cement Concrete in 1 :2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Godwin jesuthason (BID ID -1537572)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_754324.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_754324.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid