Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹3.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.8 L+₹5,151 (1.39%)Rejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹3.8 L+₹5,151 (1.39%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.8 L+₹11,651 (3.14%)Rejected-Finance 1 1 NORTH ROAD JADAVPUR KOLKATA | KOLKATA | WEST BENGAL | ₹3.8 L+₹11,651 (3.14%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MACHINE SUPPLIERS SYNDICATE PVT LTD L3 | COSMOS CONSTRUCTION L2 | POWER INDIA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Removal and reinstallation of the 6 KV HT Motor ( Cap: 225 Kw , 988 RPM Matharan make) for pump no.04 after disconnecting the motor connection line and removing of motor stool , lower half coupling adjustment nuts and staking them in repairing bay as per direction of the EIC (Ref: Comparative Statement attached). | 1 | Item | 9,500 ₹9,500 | 8,600 ₹8,600 Lowest | 8,925 ₹8,925 |
| 2.00 | Withdrawal of the Pump No.04 ( Make: WPIL Ltd. ,Model No: VT-32-24 Discharge ; 1200 CUM/hr., Head= 42.18 M), dismantling the coloumn pipes, line shaft bushes and coupling , bellmouth and cutless bearing etc. part by part as per as per direction of EIC (Ref: Comparative Statement attached). | 1 | Item | 30,000 ₹30,000 | 27,950 ₹27,950 Lowest | 27,965 ₹27,965 |
| 3.00 | To and fro transportation charges of required items from pump house to workshop and return the same from workshop to pump house as per direction of the EIC(Ref: Comparative Statement attached). | 2 | Job | 5,200 ₹10,400 | 4,900 ₹9,800 | 4,831 ₹9,662 Lowest |
| 4.00 | Supply and delivery of Cutless Bush for Line Shaft (Rubber backed SS Shell, ID: 68.4 mm) as per sample and technical specification for coloumn pipe and direction of the EIC(Ref: Comparative Statement attached). | 5 | No | 13,200 ₹66,000 | 12,450 ₹62,250 Lowest | 12,500 ₹62,500 |
| 5.00 | Supply ,delivery of Line Shaft Sleeve ( L= 300 mm , OD= 68.2 mm, SS-410 ) as per sample and direction of the EIC(Ref: Comparative Statement attached). | 5 | No | 22,500 ₹1,12,500 | 22,400 ₹1,12,000 | 21,896 ₹1,09,480 Lowest |
| 6.00 | Supply ,delivery of Head Shaft Sleeve ( L= 350 mm , ID= 60 mm) as per sample and direction of the EIC(Ref: Comparative Statement attached). | 1 | No | 34,115 ₹34,115 | 34,115 ₹34,115 | 34,113 ₹34,113 Lowest |
| 7.00 | Supply ,delivery of Bush ( L= 200 mm , ID= 68 mm, Bronze) as per sample and direction of the EIC.(Ref: Comparative Statement attached). | 1 | No | 12,915 ₹12,915 | 12,915 ₹12,915 | 12,912 ₹12,912 Lowest |
| 8.00 | Supply, delivery of HT Bolt , Nut , Washer (M24 x 110 L, SS ) as per sample and direction of the EIC (Ref: Comparative Statement attached). | 120 | Set | 160 ₹19,200 Lowest | 176 ₹21,120 | 175 ₹21,000 |
| 9.00 | Supply, delivery of Thd. Shaft coupling (ID=59 mm, L=115mm, SS 410) as per sample and direction of the EIC (Ref: Comparative Statement attached). | 2 | No | 5,320 ₹10,640 | 5,320 ₹10,640 | 5,319 ₹10,638 Lowest |
| 10.00 | Supply, delivery of Flexible coupling assembly (FG-260) as per sample and direction of the EIC (Ref: Comparative Statement attached). | 1 | Set | 4,107 ₹4,107 | 4,107 ₹4,107 | 4,106 ₹4,106 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
1 Jul 2025, 12:00 pmClosed
Executive Engineer, GAP-II, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER (E/M)/GAP-II 1/425, Gariahat Road(s), Kol-68
Replacement of damaged bowel assembly of Vertical Turbine Pump No.04 with a standby spare along with replacement of damaged necessary spares and other allied works at Raw Water Pumping Station at Najirgunj, under HMC.
2025_KMDA_867898_1
EE(E/M)/GAP-II/KMDA /2W-01/2025-26/10 Date -12.06.2025.
Open Tender
Electrical Work/ Equipment
Item Rate
10 days
Najirgunj
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,500
Office of the Executive Engineer, GAP-II, EM, KMDA
27 Aug 2026
24 Jun 2025
3 Jul 2025
24 Jun 2025
1 Jul 2025
24 Jun 2025
26 Jun 2025
Amount
Removal and reinstallation of the 6 KV HT Motor ( Cap: 225 Kw , 988 RPM Matharan make) for pump no.04 after disconnecting the motor connection line and removing of motor stool , lower half coupling adjustment nuts and staking them in repairing bay as per direction of the EIC (Ref: Comparative Statement attached).
Withdrawal of the Pump No.04 ( Make: WPIL Ltd. ,Model No: VT-32-24 Discharge ; 1200 CUM/hr., Head= 42.18 M), dismantling the coloumn pipes, line shaft bushes and coupling , bellmouth and cutless bearing etc. part by part as per as per direction of EIC (Ref: Comparative Statement attached).
To and fro transportation charges of required items from pump house to workshop and return the same from workshop to pump house as per direction of the EIC(Ref: Comparative Statement attached).
Supply and delivery of Cutless Bush for Line Shaft (Rubber backed SS Shell, ID: 68.4 mm) as per sample and technical specification for coloumn pipe and direction of the EIC(Ref: Comparative Statement attached).
Supply ,delivery of Line Shaft Sleeve ( L= 300 mm , OD= 68.2 mm, SS-410 ) as per sample and direction of the EIC(Ref: Comparative Statement attached).
Supply ,delivery of Head Shaft Sleeve ( L= 350 mm , ID= 60 mm) as per sample and direction of the EIC(Ref: Comparative Statement attached).
Supply ,delivery of Bush ( L= 200 mm , ID= 68 mm, Bronze) as per sample and direction of the EIC.(Ref: Comparative Statement attached).
Supply, delivery of HT Bolt , Nut , Washer (M24 x 110 L, SS ) as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply, delivery of Thd. Shaft coupling (ID=59 mm, L=115mm, SS 410) as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply, delivery of Flexible coupling assembly (FG-260) as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply ,delivery of Retainer Gasket as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply ,delivery of Packing (PTFE/Teflon) as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply ,delivery of hydraulic oi as per sample and direction of the EIC (Ref: Comparative Statement attached).
Supply ,delivery, fitting, fixing of MS pipe, 1 no bend, 1 no T-piece and 01 no Glove valve in 20 NB cooling water line as per sample and direction of the EIC (Ref: Comparative Statement attached).
Reinstallation of the Pump( Make: WPIL Ltd. ,Model No: VT-32-24 Discharge ; 1200 CUM/hr., Head= 42.18 M) assembly after reassembling the Bellmouth , cutless bearing ,line shaft , bushes , sleeve ,coloumn pipe and TBH accessoriesetc. all complete and proper alignment with the pump in the presence of Pump expart and direction of the EIC (Ref: Comparative Statement attached).
Painting of gates of distributory/ branch/ minor canal/ pump coloum pipe/ pump discharge pipe & other similar components on prepared surfaces with one coats of zink phosphate primer ( airless spray preferred) 50 microns/ coat and one coal tar epoxy, 150 microns/ coat including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts.(Ref: Irrigation and Waterways Dept. May 2022, Pg. No. 95, Sl. No. 5.1.I-6)
COSMOS CONSTRUCTION (BID ID -6659281)
MACHINE SUPPLIERS SYNDICATE PVT LTD (BID ID -6642459)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .