Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27,489.36Admitted-Finance | ₹27,489.36 | L1 | Admitted-Finance |
| 2 | L2₹27,746.35Admitted-Finance | ₹27,746.35 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THE ROPAR RAI COOP LC SOCIETY LIMITED L1 | THE GHAGGAR COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L2 |
|---|---|---|---|---|---|
| 1.00Brick Lining of Water course of RD 21152-R | |||||
| 1.01 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | 1 | Cum | 89.2 ₹89.20 | 92.5 ₹92.50 |
| 1.02 | Earthwork Undressed With Combined Lead Upto 15m including breaking of clods. CSR Item 6.2 (b) | 1 | Cum | 126.33 ₹126.33 | 132 ₹132 |
| 1.03 | Earthwork filling In 0.152m Layers in foundation including Ramming, Watering And Consolidation under bed. CSR Item 6.8 (b-i) | 1 | Cum | 162.25 ₹162.25 | 165 ₹165 |
| 1.04 | Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II | 1 | Cum | 71.39 ₹71.39 | 75.9 ₹75.90 |
| 1.05 | Dressing of New Earthwork CSR Item 6.3 (i) | 1 | Sqm | 1.43 ₹1.43 | 2.26 ₹2.26 |
| 1.06 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | 1 | KM | 933 ₹933 | 990 ₹990 |
| 1.07 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 210.9 ₹210.90 | 218 ₹218 |
| 1.08 | Dressing of Bed and Preparation of Sub-grade for Lining CSR Item 19.1 | 1 | Sqm | 12.48 ₹12.48 | 13.01 ₹13.01 |
| 1.09 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i) | 1 | Cum | 8,480 ₹8,480 | 8,560 ₹8,560 |
Updated dates
Tender Value
₹16.3 L
EMD Value
₹32,520
Closing Date
28 Apr 2026, 11:00 amClosed
SH. TAJINDER SINGH DIVISIONAL ENGINEER
DIVISIONAL ENGINEER BDC-2 DIVISION PWRMDC DHOALWAHA NEHAR COLONY HOSHIARPUR
BRICK LINING OF WATERCOURSES OF O/L RD 21152-R OF TALWAN MINOR OF VILLAGE BILGA DISTT. JALANDHAR
2026_WR_164735_2
NITNO.83/2026/BDC-2/PWRMDC/DT 20-03-2026
Open Tender
Civil Works
90 days
HOSHIARPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹32,520
Yes
2 May 2026
9 Apr 2026
28 Apr 2026
9 Apr 2026
28 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Brick Lining of Water course of RD 21152-R | ||||||
| 1.01 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | - | Cum | - | - | item 2 |
| 1.02 | Earthwork Undressed With Combined Lead Upto 15m including breaking of clods. CSR Item 6.2 (b) | - | Cum | - | - | item 3 |
| 1.03 | Earthwork filling In 0.152m Layers in foundation including Ramming, Watering And Consolidation under bed. CSR Item 6.8 (b-i) | - | Cum | - | - | item 4 |
| 1.04 | Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II | - | Cum | - | - | item 5 |
| 1.05 | Dressing of New Earthwork CSR Item 6.3 (i) | - | Sqm | - | - | item 6 |
| 1.06 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | - | KM | - | - | item 7 |
| 1.07 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - | item 8 |
| 1.08 | Dressing of Bed and Preparation of Sub-grade for Lining CSR Item 19.1 | - | Sqm | - | - | item 9 |
| 1.09 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i) | - | Cum | - | - | item 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_336325.xls
BOQ • 0.26 MB
BOQ83.xls
Tender Documents • 0.26 MB
DNIT.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid