| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC WORK AWARDED | |
| 2 | L2₹5.7 L+₹9,272 (1.65%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹6.3 L+₹71,117 (12.6%)Rejected-Finance BAMBOOFLAT SOUTH ANDAMAN | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹6.8 L+₹1.2 L (20.5%)Rejected-Finance | L4 | Rejected-Finance L4 BIDDER | |
| 5 | Rejected-Technical | - | Rejected-Technical Affidavit submitted not as per Tender Terms and conditions |
Tender Value
₹7.1 L
EMD Value
₹14,000
Closing Date
22 Feb 2024, 3:00 pmClosed
Deputy Conservator of Forests, Working Plan
DCF WP, Haddo
Re-eTender for the work Construction of Overhead Tank and Water Storage Tank of 20000 Ltrs for Six Family Labour Barrack at Ferrargunj Camp under DCF Working Plan Haddo
2024_DCFWP_13446_1
WP/S-120/2022-23/794
Open Tender
Civil Works - Others
Works
90 days
Ferrargunj Camp, DCF WP
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹14,000
Yes
17 May 2024
13 Feb 2024
22 Feb 2024
13 Feb 2024
22 Feb 2024
19 Feb 2024
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) :
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete.
Suspended floors, roofs, landings, balconies and access platform.
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Columns, Pillars, Piers, Abutments, Posts and Struts.
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars,
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm nominal size stone aggregate.
12 mm cement plaster of mix : 1:4 (1 cement : 4 fine sand)
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Ladder
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
Providing and fixing up to floor five level precast cement concrete hollow block including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete. 1:1½:3 (1 Cement : 1½ coarse sand(Zone III) : 3 graded stone aggregate 20 mm nominal size).
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer.
Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
SPR CONSTRUCTION
ANBE SHIVAM
Shri V R Subramani
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .