| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.1 CrAccepted-AOC | ₹3.1 Cr | l1 | Accepted-AOC L1 |
| 2 | l2₹3.6 Cr+₹55.1 L (17.8%)Rejected-AOC | ₹3.6 Cr+₹55.1 L (17.8%) | l2 | Rejected-AOC L2 |
| 3 | L3₹4.0 Cr+₹90.9 L (29.4%)Rejected-AOC | ₹4.0 Cr+₹90.9 L (29.4%) | L3 | Rejected-AOC L3 |
| 4 | l4₹4.0 Cr+₹94.6 L (30.6%)Rejected-AOC NAN | ₹4.0 Cr+₹94.6 L (30.6%) | l4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 0 272 273 1 | - | - | Rejected-Technical document incompleted |
Tender Value
₹4.0 Cr
EMD Value
₹8.1 L
Closing Date
17 Nov 2023, 12:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC MAHOBA
Construction of R.C.C. Lining work on U/s and D/s of Birma Aqueduct of Arjun feeder canal (Lot-2)
2023_UPIDC_859707_2
06/SE/2023-24
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
as per nit and tender document
2 documents required · 2 mandatory
₹7,487
₹8.1 L
2 Jan 2024
6 Nov 2023
17 Nov 2023
6 Nov 2023
17 Nov 2023
6 Nov 2023
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rates shall be quoted excluding GST)
Earth work in Making sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. including soil mixed with Kanker, boulder etc., compaction and dressing, all complete of work.
Preparation of sub grade for lining work including all cost of material, labour, T&P etc. complete of work.
Providing and Laying cement concrete M20 grade cast-in-situ sleeper 200x200mm size including cost of all material, labour, T&P etc. complete of work.
Centering and Shuttering for concrete work including all cost of material,labour, T&P etc. complete of work.
Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. required for proper completion of work.
Providing and Laying 200 thick coarse sand in drain and in layers as per drawing including cost of all material, labour charges and T&P etc. complete of work.
Laying 100mm thick R.C.C. M20 lining in bed and slopes with copping on berm including cost of all material, labour, T&P etc. required for proper completion of work.
Supplying and Laying P.V.C. seal 150mm wide and 6mm thick at joints on sleeper including cost of all material, labour, T&P etc. required for proper completion of work.
Making construction joint painting with primer and filling with sealing compound including cost of all material, labour, T&P etc. requied for proper completion of work.
Painting on top of sleeper with bitumen including cost of all material, fuel for heating, labour, T&P etc. required for proper completion of work.
Providing and Fixing 50mm dia. PVC pipe in sleeper at 5m. c/c in panels including cost of all material, labour, T&P etc. requied for proper completion of work.
Providing and Laying 200 micron thick L.D.P.E. film to cover the surface area under the lining including cost of all material, labour, T&P etc. requied for proper completion of work.
SAKSHAM BUILDERS
M/S VIVEK KUMAR SINGH
M/s Bajrang Construction & Suppliars
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .