| 1 | L1₹6.8 LAccepted-Finance | L1 | Accepted-Finance Less | |
| 2 | L2₹6.8 L+₹605.34 (0.09%)Rejected-Finance | L2 | Rejected-Finance More |
| Sl No | Description | Qty | Unit | SRII BALAJI CONSTRUCTIONS L2 | svasit Engineers L1 |
|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the Old Damaged Rcc slab including labour Charges as per the direction of departmental officers etc. completed. | 1 | m3 | 3,620 ₹3,620 | 3,614 ₹3,614 Lowest |
| 2.00 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 2 | m3 | 105 ₹210 | 103 ₹206 Lowest |
| 3.00 | 3. Dismantling the old damaged cement concrete in cement mortar as per the direction of departmental officers etc. completed. | 1 | m3 | 540 ₹540 | 534 ₹534 Lowest |
| 4.00 | 4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 11 | m3 | 185 ₹2,035 | 181 ₹1,991 Lowest |
| 5.00 | 5. Plain cement Concrete in1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete | 8 | m3 | 5,595 ₹44,760 | 5,590 ₹44,720 Lowest |
| 6.00 | 6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 76 | m2 | 490 ₹37,240 | 489 ₹37,164 Lowest |
| 7.00 | 7. Plain cement Concrete in1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 2 | m3 | 6,320 ₹12,640 | 6,319 ₹12,638 Lowest |
| 8.00 | 8. Plain cement Concrete in1:2:4 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 26 | m3 | 6,965 ₹1,81,090 | 6,963 ₹1,81,038 Lowest |
| 9.00 | 9. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 54 | m2 | 295 ₹15,930 | 292 ₹15,768 Lowest |
| 10.00 | 10.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 9 | Qtl | 9,330 ₹83,970 | 9,321 ₹83,889 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
15 Jul 2025, 3:00 pmClosed
Assistant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018.
M.R to the Storm Water Drain and Providing CC Flooring at Thandal Raman Street in ward no 32
2025_MAWS_578878_9
e2/2025-26/CZ
Open Tender
Civil Works
Works
Central zone
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
Yes
10 Sept 2025
7 Jul 2025
15 Jul 2025
7 Jul 2025
15 Jul 2025
7 Jul 2025
Amount
1. Dismantling the Old Damaged Rcc slab including labour Charges as per the direction of departmental officers etc. completed.
2. Desilting in the existing drain as per the direction of departmental officers etc. completed.
3. Dismantling the old damaged cement concrete in cement mortar as per the direction of departmental officers etc. completed.
4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed.
5. Plain cement Concrete in1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete
6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete
7. Plain cement Concrete in1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed.
8. Plain cement Concrete in1:2:4 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed.
9. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed.
10.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc..,
11.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
12.Supply & Fixing of SFRC Manhole cover With frame 600x600mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification.
13. Conveying excavated earth from the site to 15 km distance from the city limit including loading, unloading and transportation etc. complete.
Add :- GST @ 18%
SRII BALAJI CONSTRUCTIONS (BID ID -1402455)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_691911.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .