Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 1ST FLOOR AMRIT EDUCATION GOVT DEGREE COLLAGE ROAD DHALIARA TEHSIL DEHRA DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹48.2 L
EMD Value
₹97,000
Closing Date
9 Jun 2026, 12:00 pmClosed
Executive Engineer
FHQ, SSB R K Puram New Delhi
Repair and upgradation of SPT SOs Barrack at ATC SSB Kumarsain HP
2026_SSB_910971_1
24 (a)/Kumarsain/25-26
Open Tender
Civil Works
Percentage
270 days
ATC SSB Kumarsain, H.P.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹97,000
FHQ, SSB R K Puram New Delhi
10 Jun 2026
1 Jun 2026
10 Jun 2026
1 Jun 2026
9 Jun 2026
3 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 2 | All kinds of soil. | 34.95 | cum | 260.3 | ₹9,097.49 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up
to 50 m and lift upto 1.5 m | 13.42 | cum | 196 | ₹2,630.32 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 17.76 | cum | 2,123.75 | ₹37,717.8 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : | - | - | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.3 | cum | 6,812 | ₹49,727.6 |
| 7 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 17.76 | cum | 4,627.87 | ₹82,190.97 |
| 8 | Foundations, footings, bases for columns | 33.62 | sqm | 749.3 | ₹25,191.47 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | - | - | - | - |
| 10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | 2.57 | cum | 9,045.75 | ₹23,247.58 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 38.32 MB
BOQ_957399.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .