Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82,801.07Accepted-AOC ANPARA AURI SONBHADRA U P 231225 | ANPARA | SONBHADRA | U P | 231225 | ₹82,801.07 Quoted ₹70,170.40 | L1 | Accepted-AOC as per tcr |
| Sl No | Description | Qty | Unit | M/S KAMLA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00(A) Repairing of Rope pulley(14 Nos) having inner diameter 80mm and outer diameter 380mm for 6c,7c and 3c belt conveyer | ||||
| 1.01 | Machining of bore to requisite size by lathe machine after welding | 126 | hrs | 80 ₹10,080 Lowest |
| 1.02 | Deposition of weld material 660NH/equivalent electrode for shaft/pulley welding | 7.98 | kg | 480 ₹3,830.4 Lowest |
| 1.03 | Supply of brass rod 2800LNT (shaft/pulley) | 29.4 | kg | 680 ₹19,992 Lowest |
| 1.04 | Machining of shaft/pulley after welding (up to bearing/GM/Brass/bush size) | 126 | hrs | 80 ₹10,080 Lowest |
| 2.00(B) Fabrication of suporting bracket structure (20 Nos) for rope pulley | ||||
| 2.01 | Cutting of MS plates 10 mm to required size (for rope pulley bracket) | 525 | kg | 12 ₹6,300 Lowest |
| 2.02 | Machining on shaper/planer | 36 | hrs | 80 ₹2,880 Lowest |
| 2.03 | Drilling of hole for pin | 20 | hrs | 88 ₹1,760 Lowest |
| 2.04 | Machining/boring of hole to required size | 36 | hrs | 168 ₹6,048 Lowest |
Tender Value
₹1.0 L
EMD Value
₹1,300
Closing Date
9 Jun 2026, 12:00 pmClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Repairing of Rope Pulley and Fabrication of Supporting Bracket Structure for Rope Pulley of 6c and 7c at CHP, Bina Project.
2026_NCL_360387_1
B/EM/eTender/2026-27/18 dtd 28-05-2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Bina Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,300
6 Aug 2026
28 May 2026
10 Jun 2026
28 May 2026
9 Jun 2026
29 May 2026
28 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A) Repairing of Rope pulley(14 Nos) having inner diameter 80mm and outer diameter 380mm for 6c,7c and 3c belt conveyer | |||||
| 1.01 | Machining of bore to requisite size by lathe machine after welding | 126 | hrs | 1 | ₹126 |
| 1.02 | Deposition of weld material 660NH/equivalent electrode for shaft/pulley welding | 7.98 | kg | 1 | ₹7.98 |
| 1.03 | Supply of brass rod 2800LNT (shaft/pulley) | 29.4 | kg | 1 | ₹29.4 |
| 1.04 | Machining of shaft/pulley after welding (up to bearing/GM/Brass/bush size) | 126 | hrs | 1 | ₹126 |
| 2(B) Fabrication of suporting bracket structure (20 Nos) for rope pulley | |||||
| 2.01 | Cutting of MS plates 10 mm to required size (for rope pulley bracket) | 525 | kg | 1 | ₹525 |
| 2.02 | Machining on shaper/planer | 36 | hrs | 1 | ₹36 |
| 2.03 | Drilling of hole for pin | 20 | hrs | 1 | ₹20 |
| 2.04 | Machining/boring of hole to required size | 36 | hrs | 1 | ₹36 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_373257.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .