Tender Value
₹7.3 L
EMD Value
₹73,087
Closing Date
5 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Reparing and painting work of ladies toilet near 10/195 khalasi line under ward-10 zone-4.
2026_NNKAN_1143375_1
758/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
ward-10 Benajhabar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹73,087
3 Jul 2026
30 Apr 2026
5 May 2026
30 Apr 2026
5 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m ,as directed by engg-in-charge:2.1.1 All kinds of soil. | 27.6 | cum | 170 | ₹4,692 |
| 2 | Dismantling reinforced cement concrete of reinforced brick work including stacking of dismantled materials as directed by Engineer In-Charge within a latance of 60 meters (200 feet) | 2 | cum | 1,200 | ₹2,400 |
| 3 | Dismantling of cement concrete granolithic floors including base concrete brick including stacking of materials as directed by engg i/c within a distance of 60mar | 39.1 | sqm | 67 | ₹2,619.7 |
| 4 | Dismantling brick work or stone work in lime coment mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 7.6 | cum | 580 | ₹4,408 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand (zone-H): 8 graded stone aggregate 40 mm (nominal size) | 3.1 | cum | 5,740 | ₹17,794 |
| 6 | Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, hands, plain window silis, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:15:3 (1 cement 1.5 coarse sand (zone-il):3 graded stone aggregate 20 mm nominal size) | 7.27 | cum | 8,720 | ₹63,394.4 |
| 7 | Steel reinforcement for RCC work Including straightening, cutting, bending, placing, in position and binding all complete upto plinth level | 570.5 | kg | 72 | ₹41,076 |
| 8 | Providing and laying vitrified floor tiles in differers sizes (thickness to be specified by the manufacturer) with water absorbtion less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:401 cement: 4 coarse sand), jointing with grey slurry @3.3 kg/sqm including grouting the joints with white cement anul munching pigements etc. complete. Size of tile 600x600mm | 39.1 | sqm | 1,013 | ₹39,608.3 |
| 9 | Brick work with common burnt clay (non modular) bricks of class-150 In foundation and plinth in Cement mortar 1:4(1 cement: 4 coarse sand | 0.6 | cum | 6,600 | ₹3,960 |
| 10 | Brick work with common burnt clay (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes) Cement mortar 1:4 () cement: 4 coarse sand) | 11.2 | cum | 7,500 | ₹84,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2135793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2135793.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .