Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.1 Cr
EMD Value
₹7.3 L
Closing Date
20 Sept 2023, 10:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Krishna Bhagya Jala Nigam Limited
Santosh AE
Design, Supply, Installation, Testing and Commissioning of New 17.5MVA 110/6.6KV step down Power Transformer with Buy Back system of Failed 17.5MVA 110/6.6kv M/s Alstom make as is where is in condition at Indi Lift Head Works,Kembhavi with maintenance for a period of five years.
KBJNL/2023-24/IW/WORK_INDENT5
KBJNL/2023-24/IW/WORK_INDENT5
Open
Irrigation and Other Works
Two Tender Document System(Two Cover)
KBJNL Division I.B.C Division 1 Kembhavi
12 documents required · 9 mandatory · 3 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending bidder should have executed a minimum quantity of following critical items of work (usually 80% of the peak annual rate of construction) in any one financial year during the last five financial years reckoned back from 2022-23. Certificate should be issued by an officer not below the rank of Executive Engineer of the concerned Division/equivalent officer and countersigned by the Superintending Engineer of the concerned Circle/next higher officer. Particulars Minimum executed Qty Providing and fixing of 17 MVA and above , 110/6.6 KV power transformer 02 No.
A valid copy of the KPWD class-1Electrical contractor
Valid EPF Registration certificate is mandatory.
Copy of valid GST Registration Certificate.
The intending bidder should have satisfactorily completed (at least 90% of the contract value) as a prime contractor, at least one similar work of value not less than 50% of the amount put to tender (50% of Amount put tender i.e. 243.08Lakhs) during last 5 years reckoned back from 2022-23. The certificate should be issued by an officer not below the rank of Executive Engineer of the concerned Division/ Equivalent officer and counter signed by the Superintending Engineer of the concerned circle/next higher officer. The cost will be updated to the present value by giving a weightage of 10% for each year, if the work is completed prior to the year 2022-23.Note: 1) similar work means Design, supply, installation, testing and commissioning of Switchyard with at least 3 bays each of 110 KV with installed transformer capacity of minimum 20 MVA including operation and maintenance for a minimum period of 18 months for LIS system within last 5 years.
The requisite Earnest Money Deposit in e-cash.
The intending bidder should have achieved a minimum financial turnover not less than 2 times the estimated annual payments i.e, Rs.1944.64Lakhs (i.e Rs.486.16x2x12/06 months) in at least 2 financial years in the last 5 years reckoned back from 2022-23 (i.e.,2018-19 to 2022-23).The turnover prior to FY 2022-23 will be updated to the present price level by giving weightage of 10% each year. Audited profit and loss account statement certified by a practicing Chartered Accountant bearing the UDI number along with copy of Income Tax returns filed for the years indicated above should be furnished.FY 2022-23
Tenderers who meet the above specified minimum qualification criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity is calculated as under. Assessed available bid capacity (AXNX1.5 -B) where A. Maximum value of works executed in any one year during the last five years (Updated to 2023-24 price level) taking into account the completed as well as works in progress. N. Number of years, i.e.0.5 years (06 months) prescribed for completion of works for which bids are invited. B. Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 06 months (period of completion of the works for which bids are invited). Note- The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed should be certified by statutory auditors of company or by the proprietor of the company through an affidavit
Each bidder should furnish liquid assets and or/ availability of credit facilities of not less than Rs. 245.00lakhs from any Nationalised /scheduled bank Credit lines/ letter of credit/certificates from banks for meeting the fund requirement etc. (Usually the equivalent of the estimated cash flow for 3 months in peak construction period ).The format for bankers certificate / line of credit (Bc/LOC) letter to be issued by the banks as per circular no:FD CAM/16/2022(P-2) dated:22.08.2022.
₹5,000
₹7.3 L
7 Sept 2023
7 Sept 2023
22 Sept 2023
13 Sept 2023
13 Sept 2023
Design, Supply, Installation, Testing and Commissioning of New 17.5MVA 110/6.6KV step down Power Transformer with Buy Back system of Failed 17.5MVA 110/6.6kv M/s Alstom make as is where is in condition at Indi Lift Head Works,Kembhavi with maintenance for a period of five years.
Supply, erection, testing and commissioning of 1x17.5 MVA 110/6.6 KV,step-down Power Transformer, copper wound ONAN with OLTC +5% -15% in steps of 1.25% with copper(current) density limited to 1.8 amp...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TN 5.docx
Others - Tender Notification • 0.05 MB
DTP indent no.5 (1) 06-09-2023.doc
Tender Document • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .