Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.3 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹3.3 L | L-1 | Accepted-AOC Accepted as L-1 |
| Sl No | Description | Qty | Unit | RAVI KUMAR JAISWAL |
|---|---|---|---|---|
| 1.00Item Description/ Heading Part (A) labour Cost | ||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 185.86 | m3 | 55,758 ₹65,794.44 |
| 1.02 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 789.6 | m2 | 1,81,608 ₹2.1 L |
| 1.03 | White washing in u/g with white lime to give an even shade on old work/new work | 789.6 | m2 | 7,896 ₹9,317.28 |
| 1.04 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
(a) Cement | 57 | bag | 342 ₹403.56 |
| 1.05 | (b) Sand | 12.17 | m3 | 2,373.15 ₹2,800.32 |
| 1.06 | Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 01 KM or part there of and bringing the empty tub to surface.
(a) Cement | 57 | bag | 256.5 ₹302.67 |
| 1.07 | (b) Sand | 12.17 | m3 | 1,764.65 ₹2,082.29 |
| 1.08 | Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same.
(a) Cement | 57 | bag | 256.5 ₹302.67 |
| 1.09 | (b) Sand | 12.17 | m3 | 1,703.8 ₹2,010.48 |
Updated dates
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
21 Jan 2026, 5:00 pmClosed
STAFF OFFICER MINING SECL SOHAGPUR
OFFICE OF THE STAFF OFFICER MINING SECL SOHAGPUR
Plastering of 22 Nos. Old RCC Isolation Stoppings in VII Seam at Bangwar UG Mine for a period of 60 days (FY 2025-26)
2026_SECL_350691_1
SECL/SGP/ SO(M)/2025-26/NIT721
Open Tender
Civil Works - Others
60 days
BANGWAR UG
as per NIT
6 documents required · 6 mandatory
₹6,400
Yes
20 Apr 2026
6 Jan 2026
23 Jan 2026
6 Jan 2026
21 Jan 2026
7 Jan 2026
6 Jan 2026 - 13 Jan 2026
Cleaning/ removal of debris/stone from galleries and stacking within 50m distance
06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials)
White washing in u/g with white lime to give an even shade on old work/new work
Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m (a) Cement
(b) Sand
Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 01 KM or part there of and bringing the empty tub to surface. (a) Cement
(b) Sand
Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same. (a) Cement
(b) Sand
Lead for transportation/carriage of all kinds building materials by manually in ug. 61.00m to 75.00m.
Part-B Material Cost supply and stacking of building materials (a) Cement
(b) Sand
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_363446.pdf
BOQ Comparative Chart
xlsx
finsummary_363446.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_363446.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid