Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.3 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹3.3 L | L-1 | Accepted-AOC Accepted as L-1 |
| Sl No | Description | Qty | Unit | RAVI KUMAR JAISWAL |
|---|---|---|---|---|
| 1.00Item Description/ Heading Part (A) labour Cost | ||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 185.86 | m3 | 55,758 ₹65,794.44 Lowest |
| 1.02 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 789.6 | m2 | 1,81,608 ₹2,14,297.44 Lowest |
| 1.03 | White washing in u/g with white lime to give an even shade on old work/new work | 789.6 | m2 | 7,896 ₹9,317.28 Lowest |
| 1.04 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
(a) Cement | 57 | bag | 342 ₹403.56 Lowest |
| 1.05 | (b) Sand | 12.17 | m3 | 2,373.15 ₹2,800.32 Lowest |
| 1.06 | Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 01 KM or part there of and bringing the empty tub to surface.
(a) Cement | 57 | bag | 256.5 ₹302.67 Lowest |
| 1.07 | (b) Sand | 12.17 | m3 | 1,764.65 ₹2,082.29 Lowest |
| 1.08 | Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same.
(a) Cement | 57 | bag | 256.5 ₹302.67 Lowest |
| 1.09 | (b) Sand | 12.17 | m3 | 1,703.8 ₹2,010.48 Lowest |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
17 Jan 2026, 5:00 pmClosed
STAFF OFFICER MINING SECL SOHAGPUR
OFFICE OF THE STAFF OFFICER MINING SECL SOHAGPUR
Plastering of 22 Nos. Old RCC Isolation Stoppings in VII Seam at Bangwar UG Mine for a period of 60 days (FY 2025-26)
2026_SECL_350691_1
SECL/SGP/ SO(M)/2025-26/NIT721
Open Tender
Civil Works - Others
Item Wise
60 days
BANGWAR UG
as per NIT
6 documents required · 6 mandatory
₹6,400
Yes
20 Apr 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
17 Jan 2026
7 Jan 2026
6 Jan 2026 - 13 Jan 2026
Cleaning/ removal of debris/stone from galleries and stacking within 50m distance
06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials)
White washing in u/g with white lime to give an even shade on old work/new work
Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m (a) Cement
(b) Sand
Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 01 KM or part there of and bringing the empty tub to surface. (a) Cement
(b) Sand
Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same. (a) Cement
(b) Sand
Lead for transportation/carriage of all kinds building materials by manually in ug. 61.00m to 75.00m.
Part-B Material Cost supply and stacking of building materials (a) Cement
(b) Sand
stage.html
html • 0.04 MB
techsummary_363446.pdf
BOQ Comparative Chart
xlsx
finsummary_363446.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_363446.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .