| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC | L1 | Accepted-AOC Found lowest and reasonable | |
| 2 | L2₹76.1 L+₹65,710 (0.87%)Rejected-Finance 289 KASERU KHERA MAWANA ROAD MEERUT 250001 U P | MEERUT | UTTAR PRADESH | 250001 | L2 | Rejected-Finance In order but L2 | |
| 3 | L3₹80.3 L+₹4.9 L (6.45%)Rejected-Finance | L3 | Rejected-Finance In order but L3 |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
4 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(U) E/M Meerut
GE (U) Roorkee road Meerut Cantt
TENDER FOR ITEM RATE CONTRACT FOR REPAIR / MAINT OF TRANSFORMER AND ALLIED WORKS AT NORTH/ SOUTH/ BHAGAT LINES/ DABATHWA AREA UNDER AGE E/M (ES) AT GE (U) E/M MEERUT CANTT.
2023_MES_579098_1
8480/E8
Open Tender
Electrical and Maintenance Works
Works
180 days
Meerut
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
GE(U) E/M Meerut
₹90,000
Yes
18 Apr 2023
4 Feb 2023
6 Mar 2023
4 Feb 2023
4 Mar 2023
18 Feb 2023
Amount
M&L disconnecting of defective transformer from power mains and dismantling the same from 2/4 pole structure/ platform mounted substation or AGE E/M store yard and transporting the same to workshop and opening the transformer cover, draining out of transformer oil, assembling, removing of the burnt parts ie. tape, paper insulating strings etc gently and carefully, washing of the dust, rust and dirt from all parts including taking out cooling tubes, welding and re-assembling after carrying out required repair and transporting back to site/MES store yard/ installation on existing 2/4 pole structure/ platform with necessary fixing arrangement including connecting up electrically, commissioning and testing all as directed by Engr- in- Charge for the following capaity of Transformer :-
63 to 315 KVA transformer
400 to 630 KVA transformer
1000 to 2000 KVA transformer
5000 KVA Transformer
NOTE for item No1.01 to 1.04 above :- (i) The contractor shall produce test certificate as per IS-2026 alongwith high voltage test from the firms after repair. (ii) To accertain the fault of transformer at installed location, the transformer will be tested with HT 10 KV magger, multimeter in the presence of AGE E/M/JE E/M. All T&P required like HT magger 10 KV, multimeter and cables will be arrenged by contractor. (iii) All the transformer shall be opened in presence of Engr- in- Charge/ his rep verify the various repairs/replacement involved and the transformer shall be assembled in the presence of Engr- in- Charge/his rep after necessary repairs/replacement of minor parts. The cost of these parts shall be included in the unit rate of items (iv) All the transformer shall be tested in the factory in the presence of Engr- in- Charge/ his rep, as per ser note No (i) above and also in addition the transformer where specified to be installed and commissioned on the 2/4 pole structure, platform and also shall be tested by the contractor in the presence of Engr- in- Charge. (v) All the testing arrangement shall be provided by the contractor without any extra payment. (vi) The contractor shall also furnished a guarantee certificate himself for rectification of the defects. If any noticed defect during liability period for 01 year from the certified date of completion.
(vii) The above shall however does not absolve the responsibility of the contractor for rectification of any defect, if any noticed during guarantee period of 01 year as per condition 46 of IAFW-2249 and the contractor shall be solely responsible for entire completion of work and for rectification of the defect/replacement of items/parts and required pointed out by the GE during defect liability period of 01 year. Payment only for dehydration of the transformer oil and painting of the transformers replacement of certain items considered separately here- in- after shall only be made for separately all other minor repair/replacement as required and ordered by the Engr- in- Charge for entire completion of work shall be deemed to be included in the unit rate of the above items.
(viii) The contractor shall also clear the breathers. The unit rate quoted by the contractor shall included this aspect also. (ix) Contractor shall provide all arrangement for carefully handling/conveyance of/ transportation of equipment by means of crane/chain pully/recovery van and vehicles as per requirements and directed by Enge- in- Charge. (x) Transformer oil tank rubberised 6.0mm thick gasket sheet pasted using gasket cement, oil level gauge, drain valve, painting inner side tank by zinc chromate paint and outer side by approved paint include in this item rate. (xi) The rate quoted by contractor shall include all these aspect from (i) to (x) while quoting his tender that quoted rate also include the provision of providing electric connection to exisiting system.
Dismantling and segregation of HT/LT leg coil from transformer 5000 KVA and making new HT AND LT leg coil insulating copper wire of Tripple paper covering tape HT AND LT insulation as per IS specification ovening & heating after marking of coil as required and as directed by Engineer-inCharge.
Shifting of transformer of capacity 63 to 2000KVA from existing PCC platform/ four pole/two pole structure/MES store yard and fixing on platform/four pole/two pole structure by suitable capacity of crane including necessary connection on HT & LT side and testing on completion complete as directed by Enge-in-Charge.
Dismantling and segregation of HT/LT leg coil from transformer and M & L making new HT/LT leg coil with insulating copper wire of required gauge craft paper cotton tape HT/LT insulation as per specification of old transformer including ovening & heating after marking of coil as required of following capacity.
HT leg Coil copper
LT Coil copper
Disconnecting HT & LT connection of any type & capacity transformer. Opening of transformer cover at site for carrying out testing/repair such as repalcement of internal/external damage parts and re-assembling after carrying out required repair in the transformers and testing complete all as directed by Engr-in-Charge. NOTE :- Parts replaced of transformer shall be measured and paid separetly under respective items.
S&F in replacement of HT bushing complete with metal part, gasket set, nut, bolts and washers for any type of transformer at site /in workshop all as directed, for the following capacity :-
63 to 250 KVA.
300 to 400 KVA.
500 to 630 KVA.
1000 to 2000 KVA
Replacement of LT bushing complete with metal part, gasket set, nut, bolts and washers for any type of transformer at site /in workshop all as directed, for the following capacity :-
63 to 250 KVA.
1000 to 2000 KVA
Replacement of HT bushing rod (brass) complete with nuts, bolts and washers for any type of transformer at site /in workshop all as directed, for the following capacity :-
63 to 250 KVA.
1000 to 2000 KVA
S & F in replacement of LT bushing rod (brass) complete with nuts, bolts and washers for any type of transformer at site /in workshop all as directed, for the following capacity :-
63 to 250 KVA.
300 to 400 KVA.
500 to 630 KVA.
1000 to 2000 KVA
S & F in replacement of tap changer switch complete with rod and gasket for any type of transformer at site/in workshop all as directed for the following capacity :-
63 to 250 KVA.
300 to 500 KVA.
630 to 2000 KVA.
S & F in replacement of oil drain valve for any type of transformer at site/in workshop all as directed for the following capacity :-
63 to 250 KVA.
300 to 500 KVA.
630 to 2000 KVA.
Supply & replacement De-hydrating breather with first fill of dehydrating agent (silica gel) for transformer of following capacities.
63 to 250 KVA.
300 to 500 KVA.
630 to 2000 KVA.
S&F in replacement one 100mm dia, dial type thermometer, vapour pressure type having range 0-120 degree celsius with metal guard having maximum perimeter temperature reading indicator with re-setting device all as directed by Engineer-in Charge
Scraping and removing of worn out transformer oil tank gasket and supply& fixing new rubberized gasket sheet in the tank top cover, 6.0 mm thick and pasted using gasket cement, including fixing the top cover with conservator in the transformer of following capacities:-.
63 to 250 KVA.
1000 to 2000 KVA
Scrapping and removing of worn out gasket from LT and HT bushing and supply & fixing of rubberized gasket duly cut as per the size of bushing and pasted with gasket cement including cleaning and removing of carbon from HT/LT bushing, replacement of rubber oil seals, assembling the LT/HT bushing and fixing connection with terminals as directed for transformer of the following capacity:-
63 to 200 KVA.
250 to 315 KVA
M&L in replacement of fresh silica gel complete all as specified and directed.
S & F in replacement of oil level indicator glass for any type/ capacity of transformer complete all as directed .
S & F in replacement Arc flash electrical suit kit 11 KV of all sizes with tools, viz (Trouser, jacket,with hood, glooves,belt,gum boot,spiner kit)
Repair cooling pipe of transformer of any capacity at site for rectification of any leakage including welding/ Brazing complete all as specified and directed .
M& L dismantling of transformers indoor/outdoor type complete, opening top cover by unscrewing nuts, bolts, unserviceable HT/LT coil of transformer, gaskets, bushing core tap changer, draining out transformer oil and keep safely for reuse after filtration, cleaning the inner body with caustic soda/detergent and washing to removing sludge etc including painting the inner side tank by Zinc chromate paint and preparing the same for reassembling all as specified and directed by Engineer-in-Charge of following capacity :-
63 to 200 KVA.
250 to 315 KVA
400 to 500 KVA.
630 to 2000 KVA.
S & F in replacement copper strip of size should be of12 mm, 20 to 25 cm long on LT side of transformer at site duly drilled holes for transformer studs & LT cable fixed with GI bolts nuts & washers of appropriate size complete all as directed of following capacity of transformers :-
63 to 300 KVA transformer
315 to 500 KVA transformer
630 to 2000 KVA transformer
Supply & Fixing Aluminium lugs for HT bushing of suitable size by means of using crimping tool after removing existing unserviceable lugs for the following capacity of transformers all as directed by Enge-in-Charge :-
Supply & Fixing Aluminium lugs for LT bushing of suitable size by means of using crimping tool after removing existing unserviceable lugs for the following capacity of transformers all as directed by Enge-in-Charge :-
63 to 300 KVA transformer
315 to 500 KVA transformer
630 to 2000 KVA transformer
Supply & Filling of transformer oil in transformer in situ/at site for toping up the level of oil having dielectric strength 60 KV during filling after initial filtration conforming to IS-335. Transformer oil shall be supplied in sealed container complete all as directed by Engr-in-Charge.
Dehydration/ filtration of transformer oil of existing transformer installed at site with portable plant to improve the dielectric strength 60 KV during filling after initial filtration including testing of dielectric strength after dihydration at site as directed by Engineer-in-Charge.
NOTE :- (i) All arrengement of DG set of suitable capacity of electric supply for running of dehydration plant, T&P and other items required will be arranged by contractor and deem to be included in the cost of dehydration/filtration and nothing extra on this account will be admissiable.Any damage after filtration shall be solely responsible of Contractor & same shall be repaired without any additional cost.
M & L Painting of transformer indoor/ outdoor on plinth/ pole/ in workshop with one coat of synthetic enamel paint with compressor spray Gun Machine after removing all dust, Rust and paint shall confirmed to IS-2032 as directed by EIC for following capacity of transformer ;-
63 to 250 KVA transformer
300 to 500 KVA transformer
630 to 2000 KVA transformer
5000 KVA transformer
10000 KVA transformer
Testing of power transformers of Capacity 5 MVA to 10 MVA installed at MRS with Carried out the following test as the desire satisfaction of Engineer in-charge/GE :- (a) Voltage ratio test (b) Magnetization Current Test (c) Voltage balancing Test (d) Short Circuit Test (e) Oil testing having Dielectric strength upto 60 KV
NOTE :- (i) The contractor shall produce test certificate against above tests (a) to (e) from the certified firm.
Taking down old damage plaster arround the transformer pilinth and new plaster 15mm thick in cement mortar 1:6 on brick work including two coats of colour wash over one coat of wash complete all as specified and directed.
M&L for disconnecting of transformer from power mains and lifting from platform and keep aside from platform for repairing of damage platform after placing to be done and aside same connection for fed to electric supply to the connected area complete works carried out with following specification. (i) PCC 1:4:8 type D-2, 100mm thick as in sub base. (ii) PCC 1:2:4 type B-1, 150mm thick on top of platform surface finised even and fair. (iii) ISMC 100, 02 Nos, 2500mm long embedded in concrete of plateform. (iv) Removing old damage plaster arround the plinth and new plaster 15mm thick in cement mortar 1:6 on brick work including two coats of colour wash over one coat of w/wash. After carriedout repair work transformer shall be fixed on new existing location complete all as specified and directed by Engineer-in-Charge.
Supply & Fixing Copper fuse wire of required rating or size for 2/4 Pole structure DO fuses are avilable with proper arrangement all as directed by Enge-in-Charge :-
Finding out the cable fault of any size and any capacity of cable from LT 1100 Volt grade to 33000 KV with the help of cable fault loacator and with Necessary disconnection of cable from two ends and connection after repairs and having the following items with electrician at site up to length of 0.5 KM cable complete all as specified and directed by Engr-in-Charge:- (a) Surge Generator with accessories-01 No (b) Head Phone- 01 No (c) Pin Point set T-505 with accessories- 01 No (d) Earthing cable with clamp-01 Set (e) Cable fault locator T-905 with accessories -01 No (f) TC-808 with accessories -01 No (g) Soldering Iron-01 No (h) Plier- 01 Nos (i) Soldering paste -01 No (j) Capacitor Unit -1 No (k) Capacitor connecting cables-01 No (l) Power cable-01 No (m) Nose plier -01 No (n) Card for SSG -1100-01 No. Note:- Transportation charge for shifting cable fault locater will deem to be including in above said job and nothing extra on this account will be paid by the Deptt.
Shikha Enterprises
Ramesh Traders Govt Contractors & General OrderSuppliers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .