Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bid | |
| 2 | L2₹43.0 L+₹4.4 L (11.4%)Rejected-Finance R G BARUAH ROAD NEAR SHIV MANDIR GUWAHATI AIRPORT GUWAHATI 781015 | KAMRUP METRO | ASSAM | 781015 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹43.4 L+₹4.8 L (12.5%)Rejected-Finance NOT AVAILABLE | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹7.3 L−₹31.4 L (81.2%)Rejected-Finance VILL KAHIKUCHI PS PO AZARA DIST KAMRUP GUWAHATI ASSAM 781 017 | KAMRUP METRO | ASSAM | 781017 | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹47.4 L+₹8.7 L (22.6%)Rejected-Finance | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | Anupam Das L8 | Purbanchal Construction Co L5 | M/s Beekey Seekey Traders L7 | KUNDAN ENGINEERS AND BUILDERS L6 | R. D. ENTERPRISE L4 | M/s Vishnu Enterprises L2 | M/s A R Traders L3 | M/s Capital Traders L9 | M/s Rawat Enterprises L1 | M/S PANKAJ SUPPLY SYNDICATE L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling/ Paver block /chequered tiles including cement mortar bedding (but not backing) and rubbish off the premises, complete all as specified & directed. | 1,050 | Sqm | 85 ₹89,250 | 135 ₹1,41,750 | 200 ₹2,10,000 | 165.25 ₹1,73,512.5 | 210 ₹2,20,500 | 135 ₹1,41,750 | 50 ₹52,500 | 91 ₹95,550 | 8 ₹8,400 Lowest | 148 ₹1,55,400 |
| 2.00 | Demolition of cement concrete (unreinforced) in ground floors and paving not exc 15cm thickness (below or above ground level) and removal exc 250m but not exc 500 mtr and depositing, complete all as specified and directed by Engineer-in-charge | 65 | Cum | 2,500 ₹1,62,500 | 2,495 ₹1,62,175 | 3,900 ₹2,53,500 | 3,120 ₹2,02,800 | 2,750 ₹1,78,750 | 2,700 ₹1,75,500 | 1,250 ₹81,250 | 4,200 ₹2,73,000 | 200 ₹13,000 Lowest | 2,700 ₹1,75,500 |
| 3.00 | Demolition of plain cement concrete of any description and in any position not otherwise specifically provided for in this Schedule and removal exc 250m but not exc 500 mtr and depositing, complete all as specified and directed. | 3 | Cum | 2,965 ₹8,895 | 3,649 ₹10,947 | 3,105 ₹9,315 | 3,120 ₹9,360 | 2,910 ₹8,730 | 3,200 ₹9,600 | 1,750 ₹5,250 | 2,922 ₹8,766 | 575 ₹1,725 Lowest | 3,150 ₹9,450 |
| 4.00 | M&L for hardcore of broken stone or boulder of gauge not exceeding 63mm deposited spread and levelled in layers not exceeding 15mm thick, watered and rammed to a true surface as in sub base of floor complete all as specified and as directed. | 50 | Cum | 4,950 ₹2,47,500 | 2,920 ₹1,46,000 | 2,960 ₹1,48,000 | 3,150 ₹1,57,500 | 3,480 ₹1,74,000 | 3,000 ₹1,50,000 | 2,800 ₹1,40,000 | 4,510 ₹2,25,500 | 2,390 ₹1,19,500 Lowest | 3,600 ₹1,80,000 |
| 5.00 | M & L for 75mm thick PCC 1:4:8 Type D2 as in sub base, all as specified & directed. | 340 | Sqm | 975 ₹3,31,500 | 695 ₹2,36,300 | 769 ₹2,61,460 | 597.5 ₹2,03,150 | 595 ₹2,02,300 | 600 ₹2,04,000 | 550 ₹1,87,000 Lowest | 715 ₹2,43,100 | 550 ₹1,87,000 Lowest | 700 ₹2,38,000 |
| 6.00 | M & L for 100 mm thick PCC 1:2:4 Type B1 using 20 mm graded stone aggregateas in hard standing, finishing surface even and smooth without using extra cement, & making impression of expanded metal whilest the concrete is green. | 340 | Sqm | 1,120 ₹3,80,800 | 990 ₹3,36,600 | 1,011 ₹3,43,740 | 1,125 ₹3,82,500 | 876 ₹2,97,840 | 975 ₹3,31,500 | 650 ₹2,21,000 Lowest | 1,115 ₹3,79,100 | 650 ₹2,21,000 Lowest | 1,200 ₹4,08,000 |
| 7.00 | M & L for Forming 12mm thick expansion joint filled with preformed bitumious filler and top 30mm primed and sealed with sealing compund grade 'B', for 100 mm thick concrete slab all as specified & directed. | 19 | 10 RM | 865 ₹16,435 | 865 ₹16,435 | 863 ₹16,397 | 790 ₹15,010 | 610 ₹11,590 | 720 ₹13,680 | 2,500 ₹47,500 | 899 ₹17,081 | 550 ₹10,450 Lowest | 810 ₹15,390 |
| 8.00 | M&L for 50 mm thick PCC (1:3:6) type C2 using 20 mm graded crushed stone aggregate as in plinth protection, surface finished fair and even, laid to slope of 1:30 in alternative bays not exceeding 3 meter in length, complete all as specified and directed. | 30 | Sqm | 705 ₹21,150 | 700 ₹21,000 | 533 ₹15,990 | 595 ₹17,850 | 795 ₹23,850 | 640 ₹19,200 | 400 ₹12,000 Lowest | 610 ₹18,300 | 545 ₹16,350 | 690 ₹20,700 |
| 9.00 | M&L for cement concrete (1:3:6) type C2 using 20 mm graded crushed stone aggregate as in surface channels and drains and benching including finishing the top of benching even and smooth using extra cement.
Note : Forming fair finished channel for drain using extra cement shall be measured and paid for separately. | 4 | Cum | 9,620 ₹38,480 | 8,200 ₹32,800 | 9,620 ₹38,480 | 7,850 ₹31,400 | 9,655 ₹38,620 | 8,500 ₹34,000 | 7,000 ₹28,000 Lowest | 9,320 ₹37,280 | 8,991.25 ₹35,965 | 8,400 ₹33,600 |
| 10.00 | Add extra for forming fair finished drain or channel of 30 cm inner girth in cement concrete using extra cement, incl forms, moulds etc complete. | 50 | RM | 45 ₹2,250 | 59 ₹2,950 | 125 ₹6,250 | 98.75 ₹4,937.5 | 52 ₹2,600 | 65 ₹3,250 | 120 ₹6,000 | 105 ₹5,250 | 44 ₹2,200 Lowest | 60 ₹3,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
29 Sept 2025, 6:00 pmClosed
GE (AF) BORJHAR
Garrison Engineer (AF) Borjhar, Military Engineer Services, Guwahati Airport- PO, Borjhar Airport, Guwahati-15, Assam, Pin- 781015, Tele 0361 - 2840127
Repair to footpath, kerb stone, hardstanding, paver blocks and connecting work at 19 Wing, Site C and 3 AFSR under GE (AF) Borjhar
2025_MES_729830_1
8507/BOR/E8
Open Tender
Civil Works
Item Rate
270 days
GE (AF) BORJHAR
MES Contractor enlisted as Class D category a(i) having deposited Standing Security of Rs 1,00,000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
7 documents required · 7 mandatory
₹500
GE (AF) BORJHAR
₹90,000
Yes
11 Nov 2025
8 Sept 2025
3 Oct 2025
8 Sept 2025
29 Sept 2025
22 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .