| 1 | 1₹60.8 LAccepted-AOC | ₹60.8 L | 1 | Accepted-AOC ACCEPTED |
| 2 | 2₹62.2 LRejected-AOC | ₹62.2 L | 2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | Bharat Builders L1 | JAS Infra L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation | 446.2 | M3 | 463 ₹2.1 L | 500 ₹2.2 L |
| 2.00 | Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation & Below sill. | 34.32 | M3 | 7,538 ₹2.6 L | 8,000 ₹2.7 L |
| 3.00 | Vibrated Reinforced cement concrete of grade M30(Design Mix) using graded ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Retaining Wall | 308.4 | M3 | 12,820 ₹39.5 L | 13,000 ₹40.1 L |
| 4.00 | Vibrated Reinforced Cement concrete in M40 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CRASH BARRIER | 12.5 | M3 | 20,041 ₹2.5 L | 21,000 ₹2.6 L |
| 5.00 | Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete. | 14.2 | MT | 97,920 ₹13.9 L | 1,00,000 ₹14.2 L |
| 6.00 | Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete | 176 | Each | 100 ₹17,600 | 150 ₹26,400 |
Tender Value
₹76.2 L
EMD Value
₹76,230
Closing Date
19 Dec 2025, 3:00 pmClosed
COMMISSIONER, MANNARGUDI MUNICIPALITY
120, Gandhi Road, Municipal Office, Mannargudi.
Construction of Retaining wall on west side at Pudhupalam Bridge Ward No.7
2025_MAWS_629343_1
1422/2025/E1
Open Tender
Civil Works
Mannargudi Municipality
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹76,230
MUNICIPAL OFFICE
30 Jan 2026
5 Dec 2025
19 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
15 Dec 2025
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation
Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation & Below sill.
Vibrated Reinforced cement concrete of grade M30(Design Mix) using graded ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Retaining Wall
Vibrated Reinforced Cement concrete in M40 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CRASH BARRIER
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete.
Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BID7623.pdf
Tender Documents • 0.70 MB
BOQ_752570.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid