Loading…
Loading…
Tender ID
Tender Value
₹31.6 L
EMD Value
₹63,100
Closing Date
8 May 2026, 12:55 pmClosed
Manish Sehrawat
Municipal Committee Tauru
Const. of RCC Slab for Drain Covering from Pataudi chowk to Lakhpat chowk Both side in MC Tauru
2026_HRY_518753_1
2026F8C1464F 5DB7 4036 8E45 F9989B254292339ULB
Open Tender
Civil Works
Works
240 days
MC Tauru
2 documents required · 2 mandatory
₹5,000
₹63,100
Yes
30 Apr 2026
30 Apr 2026
8 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
30 Apr 2026 - 8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate] | 1,300 | Sqm | 126 | ₹1,63,800 |
| 2 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 500 | Kg. | 83 | ₹41,500 |
| 3 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 178.75 | cum | 4,374 | ₹7,81,852.5 |
| 4 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | 16,800 | Kg. | 68 | ₹11,42,400 |
| 5 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 239.2 | cum | 4,287 | ₹10,25,450.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_597643.xls
BOQ • 0.26 MB
CCTauru.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .