Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 CrAdmitted-Finance | ₹6.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹20.7 L (3.06%)Admitted-Finance 141 SAHYOG VIHAR APEX BANK COLONY E 8 EXTENSION NEAR GULMOHAR COLONY BHOPAL M P 462039 | BHOPAL | BHOPAL | MADHYA PRADESH | 462039 | ₹7.0 Cr+₹20.7 L (3.06%) | L2 | Admitted-Finance |
| 3 | L3₹8.0 Cr+₹1.3 Cr (18.6%)Admitted-Finance | ₹8.0 Cr+₹1.3 Cr (18.6%) | L3 | Admitted-Finance |
| 4 | L4₹13.2 Cr+₹6.5 Cr (95.3%)Admitted-Finance | ₹13.2 Cr+₹6.5 Cr (95.3%) | L4 | Admitted-Finance |
| 5 | L5₹13.5 Cr+₹6.7 Cr (98.3%)Admitted-Finance | ₹13.5 Cr+₹6.7 Cr (98.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Technocrats Advisory Services Pvt. Ltd. L3 | Infrastructure development consultants L2 | EDMAC Engineering Consultant India Private Limited L5 | ARMENGE Engineering private limited L1 | MSPARK Futuristics & Associates L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Professional Staff | ||||||||
| 1.10 | Team Leader Cum Senior Highway Engineer (1 No.) | 39 | Months | 1,20,000 ₹46,80,000 | 1,62,000 ₹63,18,000 | 3,50,000 ₹1,36,50,000 | 1,07,000 ₹41,73,000 Lowest | 2,76,500 ₹1,07,83,500 |
| 1.20 | Resident cum Highway Engineer (1 No.) | 84 | Months | 1,00,000 ₹84,00,000 | 90,000 ₹75,60,000 Lowest | 1,80,000 ₹1,51,20,000 | 1,07,000 ₹89,88,000 | 1,65,000 ₹1,38,60,000 |
| 1.30 | Bridge/Structural Engineer (1 No.) | 39 | Months | 1,10,000 ₹42,90,000 | 99,000 ₹38,61,000 Lowest | 2,20,000 ₹85,80,000 | 1,07,000 ₹41,73,000 | 1,75,000 ₹68,25,000 |
| 1.40 | Senior Pavement Specialist (1 No.) | 24 | Months | 1,10,000 ₹26,40,000 | 99,000 ₹23,76,000 Lowest | 2,20,000 ₹52,80,000 | 1,07,000 ₹25,68,000 | 1,65,000 ₹39,60,000 |
| 1.50 | Senior Quality Cum Material Expert (1 No.) | 24 | Months | 1,00,000 ₹24,00,000 | 99,000 ₹23,76,000 Lowest | 2,20,000 ₹52,80,000 | 1,07,000 ₹25,68,000 | 1,42,000 ₹34,08,000 |
| 1.60 | Road Safety Expert (1 No.) | 23 | Months | 50,000 ₹11,50,000 Lowest | 90,000 ₹20,70,000 | 2,70,000 ₹62,10,000 | 1,07,000 ₹24,61,000 | 1,89,000 ₹43,47,000 |
| 2.00Sub-Professional Staff | ||||||||
| 2.10 | Survey Engineer, 1 No. | 34 | Months | 1,25,000 ₹42,50,000 | 81,000 ₹27,54,000 | 72,000 ₹24,48,000 | 45,000 ₹15,30,000 Lowest | 95,000 ₹32,30,000 |
| 2.20 | Assistant Highway Engineer, 2 Nos. | 108 | Months | 60,000 ₹64,80,000 | 63,000 ₹68,04,000 | 81,000 ₹87,48,000 | 45,000 ₹48,60,000 Lowest | 75,000 ₹81,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
12 Jan 2023, 11:00 amClosed
Udaya Singh
NHIDCL HQ, New Delhi
Consultancy Services as AE for Supervision of 2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode
2022_NHIDC_723627_1
NHIDCL/Mizoram/ NH-502A/AE/2021-22
Open Tender
Civil Works
Item Rate
2555 days
Mizoram
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
4 May 2023
15 Nov 2022
13 Jan 2023
15 Nov 2022
12 Jan 2023
22 Dec 2022
15 Nov 2022 - 2 Dec 2022
2 Dec 2022
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer (1 No.)
Resident cum Highway Engineer (1 No.)
Bridge/Structural Engineer (1 No.)
Senior Pavement Specialist (1 No.)
Senior Quality Cum Material Expert (1 No.)
Road Safety Expert (1 No.)
Sub-Professional Staff
Survey Engineer, 1 No.
Assistant Highway Engineer, 2 Nos.
CAD Expert, 1 No.
Environmental Engineer, 1 No.
Assistant Bridge Engineer, 1 No.
Assistant Quality cum Material Engineer, 2 Nos.
Electrical Engineer, 1 No.
Quantity Surveyor, 1 No.
Horticulture cum Landscaping Expert, 1 No.
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 no during Maintenance Period.)
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 no during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 30 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 300 sqm area shall be rented at one location in midway of project during Construction Period
One Office of Minimum 50 sqm area shall be rented in midway of project during Maintenance Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (5 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (28.244 kms x 8 times)
Pavement strength measurement using FWD (28.244 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (28.244 kms x 8 times)
Road signs inspection using Retro Reflectometer (28.244 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Infrastructure development consultants
Technocrats Advisory Services Pvt. Ltd.
MSPARK Futuristics & Associates
EDMAC Engineering Consultant India Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .