| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹62.6 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹63.0 L+₹37,421.25 (0.60%)Rejected-Finance | 2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | T MASTHAN L1 | T C MAHENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 1,552 | M2 | 23 ₹35,696 Lowest | 25 ₹38,800 |
| 2.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam 200mm (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 466 | M3 | 3,091 ₹14,40,406 Lowest | 3,100 ₹14,44,600 |
| 3.00 | Providing and laying of prime coat using emulsion at the rate of 7 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications. | 4,655 | M2 | 82 ₹3,81,710 Lowest | 85 ₹3,95,675 |
| 4.00 | Providing and laying of tack coat using emulsion at the rate of 2.5 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications. | 4,655 | M2 | 17.25 ₹80,298.75 Lowest | 20 ₹93,100 |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 233 | M3 | 11,491 ₹26,77,403 Lowest | 11,500 ₹26,79,500 |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 140 | M3 | 11,751 ₹16,45,140 Lowest | 11,760 ₹16,46,400 |
Tender Value
₹75 L
EMD Value
₹75,000
Closing Date
26 Feb 2026, 3:00 pmClosed
EXECUTIVE OFFICER GUMMIDIPOONDI TOWN PANCHAYAT
NO 1 METTU STREET EXECUTIVE OFFICER GUMMIDIPOONDI TOWN PANCHAYAT
Providing and Laying of BT Road at Kottaikarai Anna Nagar BDO Office Road Kottaikarai Anna , Nethaji and Subachandrabose Street
2026_DTP_664805_1
52/2026/HC
Open Tender
Civil Works
Works
90 days
NSMT Providing and Laying of BT Road at Kottaika
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹75,000
Yes
EXECUTIVE OFFICER GUMMIDIPOONDI TOWN PANCHAYAT
19 Mar 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
24 Feb 2026
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam 200mm (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying of prime coat using emulsion at the rate of 7 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications.
Providing and laying of tack coat using emulsion at the rate of 2.5 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 1.06 MB
BOQ_798376.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .