| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹27.1 L+₹1.4 L (5.43%)Rejected-Finance ASHOK NAGAR ETAWAH ETAWAH UTTAR PRADESH 206001 | ETAWAH | UTTAR PRADESH | 206001 | L2 | Rejected-Finance NA | |
| 3 | L3₹28.8 L+₹3.2 L (12.3%)Rejected-Finance | L3 | Rejected-Finance NA | |
| 4 | L4₹29.0 L+₹3.4 L (13.1%)Rejected-Finance | L4 | Rejected-Finance NA | |
| 5 | L5₹32.1 L+₹6.4 L (24.8%)Rejected-Finance | L5 | Rejected-Finance NA |
Tender Value
Refer Docs
EMD Value
₹66,100
Closing Date
18 Mar 2021, 3:00 pmClosed
EE KCD BANDA
EE KCD BANDA
Tindwari rajbaha ke km 7.700 par box culvert ka punarnirman ka karya tahtha tindwari rajbaha ke km 7.660 km 12.576 avam km 11.100 par puliya marammat ka karya Lot-68
2021_UPIDC_563207_68
03/ken/nivida/2020-21 dt 01.03.2021
Open Tender
Civil Works
Item Rate
90 days
BANDA
Tindwari rajbaha ke km 7.700 par box culvert ka punarnirman ka karya tahtha tindwari rajbaha ke km 7.660 km 12.576 avam km 11.100 par puliya marammat ka karya Lot-68
2 documents required · 2 mandatory
₹354
₹66,100
Yes
3 Jul 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
Amount
Dismentling of P.C.C, Brick or stone masonary in lime or cement mortar.
Dismentling of R.C.C
E/w in MKRK mixed soil in foundation with disposal with in 30m lead
Sand filling in foundation i/c all cost of material labour T&P etc.
C.C. 1:3:6 with 20-40mm gauge stone ballast i/c all cost of material labour T&P etc.
Laying C.C. 1:2:4with 20-40mm gauge stone ballast i/c all cost of material labour T&P etc.
R.C.R. Stone masonary with 1:4 cement sand mortar i/c all cost of material labour T&P etc.
C.C. 1:1 1/2:3 with 10-20mm gauge stone ballast i/c all cost of material labour T&P etc.
Centring and shuttering for RCC slab,lintels and simple beam including all materials and T & P
S/L reinforcement as for steel with cutting bending & binding in position
Laying R.C.C. 1:1:2 with 10-20mm gauge stone ballast i/c all cost of material labour T&P etc.
Laying R.C.C. 1:1:2 with 10-20mm gauge stone ballast i/c all cost of material labour T&P etc.
Struck raised cement pointing with 1:2 cement sand mortor with i/c all cost of material labour T&P
E/W in MKRK mixed soil in correcting section of canal i/c lead upto 595m and lift upto 1.5m with manual compaction and dressing. E/W making diversion
Finishing walls with acrylic shooth exterior paint of required shade of new work (Two or more coat applied @ 1.67 lts/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg./10sqm.)
Grouted stone boulder pitching in 1:4 CM and 40-60 kg
Dry stone boulder pitching 40-60 kg
Singh Iron Industries
M/S VIVEK KUMAR SINGH
MS RAMSHARAN PATEL THEKEDAR
M/S DINESH KUMAR NIGAM CONT
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .