Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹15.2 L Quoted ₹22.0 L | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical 267 1 B KULAKARAI STREET PATTRAVAKKAM NEXT TO SIDCO 145 CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical TUTICORIN TAMIL NADU | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Water washing of boiler inter pass area (inclusive of re-heater coils,water wall screen tubes,SH screen tubes etc). Inclusive of consumables and hire charges for T&P’s. | 3 | Time | 13,200 ₹39,600 |
| 2.00 | Water washing of boiler First pass water walls inclusive of gooseneck bends area through peepholes. Including cost of consumables and hire charges for T&P's etc. | 3 | Time | 13,200 ₹39,600 |
| 3.00 | Water washing of boiler Second pass. Including cost of consumables and hire charges for T&P's. | 3 | Time | 29,700 ₹89,100 |
| 4.00 | Removal of heavy lumps of soot deposited on water walls and Burner corner 1,2,3 & 4 by using wire brushes /scrapping with assistance of sky climber. Including cost of consumables and hire charges for T&P's. | 1 | Time | 88,000 ₹88,000 |
| 5.00 | Removal of heavy lumps of soot deposited on boiler inter pass Reheater coil by using wire brushes /scrapping with assistance of sky climber. Including cost of consumables and hire charges for T&P's. | 3 | Time | 26,400 ₹79,200 |
| 6.00 | Charges for collecting,removal of ash inside the boiler penthouse headers and boiler drum area,disposal of ash to the ground floor ash trench. Including cost of consumables and hire charges for T&P's. | 3 | Time | 1,36,400 ₹4.1 L |
| 7.00 | Charges for removal of ash from penthouse roofing floor and rear arch room, disposal the ash to the ground floor ash trench. Including cost of consumables and hire charges for T&P's. | 3 | Time | 38,500 ₹1.2 L |
| 8.00 | Charges for removal of ash from Economizer hopper flue gas deflection slope and dispose to ground floor ash trench.Including cost of consumables and hire charges for T&P's. | 3 | Time | 1,19,900 ₹3.6 L |
| 9.00 | Charges for removal of ash from boiler front and rear "S" panel enclosure area and dispose to ground floor ash trench. Including cost of consumables and hire charges for T&P's. | 3 | Time | 49,500 ₹1.5 L |
| 10.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.Including Consumables and hire charges of T&P’s. | 3 | Time | 13,750 ₹41,250 |
Tender Value
Refer Docs
EMD Value
₹23,700
Closing Date
2 Aug 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I II III Erection operation and dismantling of sky climbers to assist various works and removal of accumulated ash in pent house rear arch enclosure cleaning of boiler by water washing
2025_EB_587566_1
CE SE MI NCTPS I 159 25 26
Open Tender
Power/Energy Projects/Products
120 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,700
Yes
2 May 2026
31 Jul 2025
4 Aug 2025
31 Jul 2025
2 Aug 2025
31 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_701936.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid