Tender Value
₹3.1 L
EMD Value
₹3,100
Closing Date
15 May 2023, 3:30 pmClosed
Block Development Officer, Kuthalam
Block Development Office, Kuthalam
CONSTRUCTION OF Compound Wall in AD Mayana Kottagai at Anandhanallur Panchayat 38m
2023_RDTN_311679_7
3018/2022/A7 Date 02.05.2023
Open Tender
Civil Works
Item Rate
120 days
Ananthanallur
CONSTRUCTION OF Compound Wall in AD Mayana Kottagai at Anandhanallur Panchayat 38m
9 documents required · 9 mandatory
₹0
₹3,100
Yes
Block Development Office, Kuthalam
18 May 2023
6 May 2023
15 May 2023
6 May 2023
15 May 2023
6 May 2023
6 May 2023 - 8 May 2023
8 May 2023
Amount
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 I Depth (G O No. 26/27.02.2014)
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification. TNBP SS NO 24 & 25
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted TNBP SS NO. 28
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., Below GL
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Govindarajan
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .