| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC | ₹7.3 Cr Quoted ₹7.4 Cr | L1 | Accepted-AOC Lowest and reasonable |
| 2 | L2₹7.8 Cr+₹41.5 L (5.62%)Rejected-AOC | ₹7.8 Cr+₹41.5 L (5.62%) | L2 | Rejected-AOC Not Lowest |
| 3 | L3₹8.0 Cr+₹60.6 L (8.20%)Rejected-AOC | ₹8.0 Cr+₹60.6 L (8.20%) | L3 | Rejected-AOC Not Lowest |
| 4 | L4₹8.1 Cr+₹73.6 L (9.96%)Rejected-AOC | ₹8.1 Cr+₹73.6 L (9.96%) | L4 | Rejected-AOC Not Lowest |
| 5 | L5₹8.9 Cr+₹1.5 Cr (20.4%)Rejected-AOC | ₹8.9 Cr+₹1.5 Cr (20.4%) | L5 | Rejected-AOC Not Lowest |
| Sl No | Description | Qty | Unit | Tarmac Road and Roof Builders Srinagar L4 | mirco builders L2 | m/s zeal construction co L1 | ALCO Engineers Private Limited L5 | Crown Chemicals L6 | M N ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) This Schedule 'A' Part- XIV is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained. | |||||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 1,51,74,861 ₹1,51,74,861 | 1,35,03,054.6 ₹1,35,03,054.6 Lowest | 2,00,00,000 ₹2,00,00,000 | 1,70,00,000 ₹1,70,00,000 | 1,68,00,000 ₹1,68,00,000 | 1,54,00,000 ₹1,54,00,000 |
| 2.02 | Lump sum price worked out by the contractor for BUILDING WORKS (RENOVATION OF SENTRY POST AND OTHERS) carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 82,94,765 ₹82,94,765 | 1,02,46,473.88 ₹1,02,46,473.88 | 80,00,000 ₹80,00,000 Lowest | 1,20,00,000 ₹1,20,00,000 | 1,26,37,820 ₹1,26,37,820 | 90,00,000 ₹90,00,000 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,06,211 ₹1,06,211 | 1,01,594.24 ₹1,01,594.24 | 90,000 ₹90,000 Lowest | 1,20,000 ₹1,20,000 | 1,38,538 ₹1,38,538 | 1,20,000 ₹1,20,000 |
| 2.04 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 16,58,166 ₹16,58,166 | 14,59,186.41 ₹14,59,186.41 | 11,00,000 ₹11,00,000 Lowest | 15,00,000 ₹15,00,000 | 19,89,800 ₹19,89,800 | 12,00,000 ₹12,00,000 |
| 2.05 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 1,52,778 ₹1,52,778 | 1,47,417.79 ₹1,47,417.79 Lowest | 1,50,000 ₹1,50,000 | 1,80,000 ₹1,80,000 | 2,01,024 ₹2,01,024 | 1,50,000 ₹1,50,000 |
| 2.06 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 16,48,137 ₹16,48,137 | 15,36,400.35 ₹15,36,400.35 | 10,00,000 ₹10,00,000 Lowest | 17,00,000 ₹17,00,000 | 20,95,091 ₹20,95,091 | 12,00,000 ₹12,00,000 |
| 2.07 | Lump sum price worked out by the contractor for FENCING, SECURITY WALL AND GATE WORKS (NEW AND OLD RENOVATION WORK) carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 3,48,86,238 ₹3,48,86,238 | 3,08,72,777.08 ₹3,08,72,777.08 | 2,75,00,000 ₹2,75,00,000 Lowest | 3,51,69,888 ₹3,51,69,888 | 4,05,09,166 ₹4,05,09,166 | 3,23,00,000 ₹3,23,00,000 |
| 2.08 | Lump sum price worked out by the contractor for ROAD/ PATH/ HARD STANDING AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 74,60,456 ₹74,60,456 | 66,61,122.15 ₹66,61,122.15 | 65,00,000 ₹65,00,000 Lowest | 70,00,000 ₹70,00,000 | 82,91,683 ₹82,91,683 | 65,00,000 ₹65,00,000 Lowest |
Tender Value
₹6.8 Cr
EMD Value
₹6.7 L
Closing Date
2 Apr 2026, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
ADDN/ALTN TO SECURITY WALL, ELEVATED SENTRY POST AND PROVN OF SINGLE LIV ACCN FOR NIGHT PICKETS, SECURITY WALL AND PATROLLING PATH AT SHARIFABAD UNDER AGE(I) CIF (K)
2026_MES_754582_1
800182
Open Tender
Civil Works
Lump-sum
600 days
AGE(I) CIF(K)
As per tender documents
11 documents required · 11 mandatory
₹3,000
AGE(I) CIF(K) Sharifabad
₹6.7 L
Yes
12 Jun 2026
27 Feb 2026
4 Apr 2026
27 Feb 2026
2 Apr 2026
28 Mar 2026
27 Feb 2026 - 7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 1,36,88,648 | ₹1,36,88,648 |
| 2.02 | Lump sum price worked out by the contractor for BUILDING WORKS (RENOVATION OF SENTRY POST AND OTHERS) carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 97,58,546.55 | ₹97,58,546.55 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 92,358.4 | ₹92,358.4 |
| 2.04 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 6,71,632.72 | ₹6,71,632.72 |
| 2.05 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 4,48,316.06 | ₹4,48,316.06 |
| 2.06 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 13,96,727.59 | ₹13,96,727.59 |
| 2.07 | Lump sum price worked out by the contractor for FENCING, SECURITY WALL AND GATE WORKS (NEW AND OLD RENOVATION WORK) carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 3,08,72,777.08 | ₹3,08,72,777.08 |
| 2.08 | Lump sum price worked out by the contractor for ROAD/ PATH/ HARD STANDING AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 66,61,122.15 | ₹66,61,122.15 |
| 2.09 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-IX. | 1 | Each | 63,693.2 | ₹63,693.2 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_845184.xls
BOQ • 0.34 MB
TenderSharifabadMerged.pdf
Tender Documents • 1.95 MB
DrgMergeCompressed.pdf
Additional Documents • 14.14 MB
CorrigendumNo02otherWithDrg.pdf
PDF • 21.19 MB
Corrigendum02date.pdf
PDF • 0.02 MB
CorrigendumNo1othersMerged.pdf
PDF • 0.23 MB
CorrigendumNo1othersMerged.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .