Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC | ₹7.3 Cr Quoted ₹7.4 Cr | L1 | Accepted-AOC Lowest and reasonable |
| 2 | L2₹7.8 CrRejected-AOC | ₹7.8 Cr | L2 | Rejected-AOC Not Lowest |
| 3 | L3₹8.0 CrRejected-AOC | ₹8.0 Cr | L3 | Rejected-AOC Not Lowest |
| 4 | L4₹8.1 CrRejected-AOC | ₹8.1 Cr | L4 | Rejected-AOC Not Lowest |
| 5 | L5₹8.9 CrRejected-AOC | ₹8.9 Cr | L5 | Rejected-AOC Not Lowest |
| Sl No | Description | Qty | Unit | Tarmac Road and Roof Builders Srinagar L4 | mirco builders L2 | m/s zeal construction co L1 | ALCO Engineers Private Limited L5 | Crown Chemicals L6 | M N ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) This Schedule 'A' Part- XIV is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained. | |||||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 1,51,74,861 ₹1.5 Cr | 1,35,03,054.6 ₹1.4 Cr | 2,00,00,000 ₹2 Cr | 1,70,00,000 ₹1.7 Cr | 1,68,00,000 ₹1.7 Cr | 1,54,00,000 ₹1.5 Cr |
| 2.02 | Lump sum price worked out by the contractor for BUILDING WORKS (RENOVATION OF SENTRY POST AND OTHERS) carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 82,94,765 ₹82.9 L | 1,02,46,473.88 ₹1.0 Cr | 80,00,000 ₹80 L | 1,20,00,000 ₹1.2 Cr | 1,26,37,820 ₹1.3 Cr | 90,00,000 ₹90 L |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,06,211 ₹1.1 L | 1,01,594.24 ₹1.0 L | 90,000 ₹90,000 | 1,20,000 ₹1.2 L | 1,38,538 ₹1.4 L | 1,20,000 ₹1.2 L |
| 2.04 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 16,58,166 ₹16.6 L | 14,59,186.41 ₹14.6 L | 11,00,000 ₹11 L | 15,00,000 ₹15 L | 19,89,800 ₹19.9 L | 12,00,000 ₹12 L |
| 2.05 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 1,52,778 ₹1.5 L | 1,47,417.79 ₹1.5 L | 1,50,000 ₹1.5 L | 1,80,000 ₹1.8 L | 2,01,024 ₹2.0 L | 1,50,000 ₹1.5 L |
| 2.06 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 16,48,137 ₹16.5 L | 15,36,400.35 ₹15.4 L | 10,00,000 ₹10 L | 17,00,000 ₹17 L | 20,95,091 ₹21.0 L | 12,00,000 ₹12 L |
| 2.07 | Lump sum price worked out by the contractor for FENCING, SECURITY WALL AND GATE WORKS (NEW AND OLD RENOVATION WORK) carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 3,48,86,238 ₹3.5 Cr | 3,08,72,777.08 ₹3.1 Cr | 2,75,00,000 ₹2.8 Cr | 3,51,69,888 ₹3.5 Cr | 4,05,09,166 ₹4.1 Cr | 3,23,00,000 ₹3.2 Cr |
| 2.08 | Lump sum price worked out by the contractor for ROAD/ PATH/ HARD STANDING AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 74,60,456 ₹74.6 L | 66,61,122.15 ₹66.6 L | 65,00,000 ₹65 L | 70,00,000 ₹70 L | 82,91,683 ₹82.9 L | 65,00,000 ₹65 L |
Updated dates
Tender Value
₹6.8 Cr
EMD Value
₹6.7 L
Closing Date
23 Apr 2026, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
ADDN/ALTN TO SECURITY WALL, ELEVATED SENTRY POST AND PROVN OF SINGLE LIV ACCN FOR NIGHT PICKETS, SECURITY WALL AND PATROLLING PATH AT SHARIFABAD UNDER AGE(I) CIF (K)
2026_MES_754582_1
800182
Open Tender
Civil Works
600 days
AGE(I) CIF(K)
As per tender documents
11 documents required · 11 mandatory
₹3,000
AGE(I) CIF(K) Sharifabad
₹6.7 L
Yes
12 Jun 2026
27 Feb 2026
25 Apr 2026
27 Feb 2026
23 Apr 2026
11 Apr 2026
27 Feb 2026 - 7 Mar 2026
Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) This Schedule 'A' Part- XIV is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained.
LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I.
Lump sum price worked out by the contractor for BUILDING WORKS (RENOVATION OF SENTRY POST AND OTHERS) carried forward from Pre-Priced Schedule 'A' Part-II.
Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III.
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-IV.
Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-V.
Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI.
Lump sum price worked out by the contractor for FENCING, SECURITY WALL AND GATE WORKS (NEW AND OLD RENOVATION WORK) carried forward from Pre-Priced Schedule 'A' Part-VII.
Lump sum price worked out by the contractor for ROAD/ PATH/ HARD STANDING AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII.
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-IX.
Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-X.
Lump sum price worked out by the contractor for PROVN OF STAND FOR RAMP WORKS carried forward from Pre-Priced Schedule 'A' Part-XI.
Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-XII.
MISC ITEM WORKS (SCHEDULE 'A' PART-XIV) (A) FENCING, SECURITY WALL AND GATE WORKS (NEW AND OLD RENOVATION WORK)
Supply and fixing punched tape concertina fencing 540mm erected dia (i.e 610mm dia coil) made with high tensile strength galvanized mild steel wire 2.6mm dia as per IS-4454 strip material (galvanized MS strip as per IS-1730) upto 3 metre height of wall with angle iron Y shaped placed 3.0 apart and with 9 horizontal RBT stud tie with GI staples and GI clips to retain horizontal including necessary bolting or GI based wire tied to angle iron with reinforced barbed tape (RBT)/ spring core (2.6mm dia) wire minimum barb 9mm width, loop spacing 250 (+)(-) 20mm , coil length 9m and fixing and laid in positon etc of make as approved by GE conforming to specification complete all as specified and directed.
(B) EXTERNAL ELECTRIFICATION WORKS
M&L for Road cutting for cable crossing and cutting with machine of appx size 45 cm and 90 cm depth with trench less method and making goodexisting surfaces complete all as specified and directed.
Supply & fixing HT/LT Cable Route indicator /marker Dia-150/100 mm & thickness-3mm round shape with corrosion resistant made by Stainless steel complete all as specified and directed.
S & F of thermoplastic Cable Junction Box/ Distribution Board IP-65 with metric knockouts for cable entry of size 10 to 35 sq mm x 4 core including fastening clamp with LT pole, box size: 333 x 233x 120mm hinged cover with locking arrangements including with terminals TPN strip, with 01 No MCB SP 6A of Make: HENSEL/ equivalent of Sintex complete all as specified and directed.
Supply, installation, testing and commissioning street light Timer Switch distribution boards max load 6 KW, Digital 24 Hour capacity, 415 volt, made out of CRCA Sheet Steel with front openable door fitted with necessary hinges, door locking by Panel lock and provision for Pad Locking duly phosphatized and powder coated and conforming to IP 54 degree of protection, complete suitable for wall mounting/ pole mounting with suitable clamps, nuts & bolts etc, internally pre-wired with suitable guage of copper wires and connecting up all incoming and outgoing cables with suitable cable glands, lugs, nuts, bolts and washers complete suitable for accommodating and including provision of following switchgears/ components :- a) Incoming MCB 40 Amp TPN - 01 No. b) 3 pole contactor 32 Amp TP - 01 No. d) Timer switch Digital type, 24 Hour - 01 No. Make: Havells cat No IHXTS03060 or equivalent in L&T/HPL/Indo asian.
S&Fof LT Busbar panel board, outdoor type door cubical type, slopy roof, front back both side opeing, padestal maounted overall size not less than 500 x 400 x 250mm, CPRI approved,IP-48 having independent compartment for bus bar, incoming feeder and each out going feeders dust and vermin proof and lockable, factory made, fabricated out of 3.15mm thick CRCA sheet sutable for 3 phase 415 Volts 50 HZ, AC supply , bus bar chamber with Aluminium bus bar of 200 Amps rating for 3 phase and bus bar of same capacity for neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators. common earth bus bar of GI strip 25x4 mm at bottom with independent plates at bottom for each out going and in coming cables in cable alley panel board and painted with powder coating in siemens grey colour as specified and directed.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_845184.xls
BOQ • 0.34 MB
TenderSharifabadMerged.pdf
Tender Documents • 1.95 MB
DrgMergeCompressed.pdf
Additional Documents • 14.14 MB
Download all tender documents and submit your bid