| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.5 LAdmitted-Finance | -16.55% | ₹16.5 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 LAdmitted-Finance GRAM DHWAJA MOROLI POST JAS PURA TEHSIL BAYANA DISTRICT BHARATPUR RAJASTHAN | -14.63% | ₹16.9 L | L2 | Admitted-Finance |
| 3 | L3₹17.2 LAdmitted-Finance | -13.21% | ₹17.2 L | L3 | Admitted-Finance |
| 4 | L4₹19.1 LAdmitted-Finance | -3.65% | ₹19.1 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | - | - | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
₹19.8 L
EMD Value
₹39,612
Closing Date
14 Dec 2025, 5:00 pmClosed
Executive Engineer, WDSC, P.S. Jamwaramgarh
Executive Engineer, WDSC, P.S. Jamwaramgarh
Construction of SSB in Gram Panchayat - Bilod, TodameenaPMKSY 2.0 WDC-07 JAMWARAMGARH 2021-22
2025_WDSC_516429_1
02/2025-2026 231/28-11-2025
Open Tender
Civil Works
120 days
Bilod, TodameenaPMKSY 2.0 WDC-07 JAMWARAMGARH 2021
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
as per nit
₹39,612
Executive Engineer, WDSC, P.S. Jamwaramgarh
8 Jan 2026
30 Nov 2025
15 Dec 2025
30 Nov 2025
14 Dec 2025
30 Nov 2025
4 Dec 2025
15 ls0eh0 तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना। साधारण /बलुआ/मुलायम मिटटी में
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Soft Soil) Item No. 196a GKN 2025-26 Cut of Wall
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Ist Lift Cut off Wall (From 3 m depth to 4.5 m depth)
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required IIed Lift Cut off Wall (From 4.5 m depth to 6 m depth)
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required IIIrd Lift Cut off Wall (From 6 m depth to 6.5 m depth)
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. Cut off Wall /Deduct Cut off Wall Qty
Side shuttering including propping etc. complete (to achieve finish F 2 for : (a) Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontally laid mass concrete) Cut off Wall Qty
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) Item No. 196B GKN 2024-25
मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) 5 कि.मी.
Compaction of earth or highly weathered strata.By manually or plain roller. (density 90% of Proctor) Item No. 18 (a) Ch No. V, WRD 2023
Watering of earth including cost of carriage of water when source of water is upto 2 kms. Item No. 28 (a) & Ch No. V, WRD 2023
Supplying, laying & spreading of LDPE film of 250 micronon bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Item No. 39 Ch No IX, WRD 2023 side Top
सीमेंट कंक्रीट 1:2:4 मिश्रण की प्रवलित सीमेंट कंक्रीट में डालना तथा आपूर्ति करना, छत की स्लैआब, छज्जेज, बीम, लिंटल आदि में दबाना, तराई करना तथा सतह को 1:3 सीमेंट मसाले से समतल करना आदि समेत पाडबन्दी सहित परन्तुद स्टी ल तथा शटरिंग की कीमत अलग से।
P/F Display Board
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Bid4.pdf
Tender Documents • 9.97 MB
BOQ_921498.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid