| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.3 Cr+₹12.7 L (4.00%)Admitted-Finance DISTT BARMER | BARMER | BARMER | RAJASTHAN | L2 | Admitted-Finance | ||
| 3 | L3₹3.9 Cr+₹69.1 L (21.7%)Admitted-Finance 08 MOOLANI CHOUKHALA KAWAS BAYTU BARMER BARMER RAJASTHAN 344035 | BARMER | RAJASTHAN | 344035 | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive due to similar nature of work not executed |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
14 Sept 2026, 6:00 pmClosed
ACE PWD
Zone Jodhpur-II HQ Barmer
Construction of Guest Room, Parking Shed, Compound wall and Musical Fountain at Shri Ranchhor Rai Khed Tirth, Khed Distt. Balotra
2026_CEPWD_592126_1
NIT No 02/2026-27 ACE PWD Zone Jodhpur-II (HQ BMR)
Open Tender
Civil Works - Buildings
Percentage
330 days
Balotra
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Ex EN PWD Dn Balotra
₹7.5 L
Yes
22 Sept 2026
23 Aug 2026
15 Sept 2026
24 Aug 2026
14 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A : CIVIL WORK
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 0.02 | Hect. | 10,374 | ₹207.48 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 636.25 | Cum | 178 | ₹1,13,252.5 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate
40 mm nominal size). | 54.42 | Cum | 3,962.4 | ₹2,15,633.81 |
| 4 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) | 242.49 | sqm | 47 | ₹11,397.03 |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers and rolling every 3rd and top- most layer with power roller of minimum 8-10 tonne capacity and dressing up in embankment for roads, flood banks marginal banks and guide banks or filling up ground depressions, lead up to 50 Mtr. and lift up to 1.5 Mtr.:All kinds of soil | 84.69 | cum | 272 | ₹23,035.68 |
| 6 | Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand | 70.1 | cum | 1,024 | ₹71,782.4 |
| 7 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 50 | litre | 243 | ₹12,150 |
| 8 | Random rubble dry stone Kharanja under floor. | 30.08 | Cum | 1,118 | ₹33,629.44 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 150 | Cum | 64 | ₹9,600 |
| 10 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 285.08 | Cum. | 3,406 | ₹9,70,982.48 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.33 MB
Tendernotice_2.pdf
PDF • 9.49 MB
Tendernotice_3.pdf
PDF • 3.12 MB
Tendernotice_4.pdf
PDF • 1.69 MB
Tendernotice_5.pdf
PDF • 0.19 MB
Tendernotice_6.pdf
PDF • 3.22 MB
PA_KHED.pdf
Other Document • 0.65 MB
BOQ_1051247.xls
BOQ • 0.49 MB
corrigendum1date.pdf
PDF • 0.52 MB
77777777777777777777777777.pdf
PDF • 0.65 MB
222222222222222222222.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .