Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC RAHMANPUR LUCKNOW | ₹1.8 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | Not Admitted-Fee/PreQual/Technical RAHMANPUR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.8 Cr
EMD Value
₹11.2 L
Closing Date
23 Mar 2026, 12:00 pmClosed
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction of Magarpur ka mazra Rampura Link road
2026_CEJNS_1126654_2
1195/ 44 C- Jhansi Circle/25 Date 14.02.2026
Open Tender
Civil Works - Roads
270 days
Lalitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,800
₹11.2 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
3 Jun 2026
18 Mar 2026
23 Mar 2026
18 Mar 2026
23 Mar 2026
18 Mar 2026
19 Mar 2026
Construction of embankment with approved material obtained from local pits with a lift up to 1.50 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5 (Excluding GST)
Construction of subgrade and earthen shoulders with approved material obtained from Local pits with all lifts and leads, transporting to site, spreading, grading to requited slope and compacted to meet requirement of table 300.2 as per technical specification clause 303.1 including stabilization with 2 % Slaked lime including its mixing with rotavator complete. (Excluding GST)
Construction of Granular sub-base with 53-9.5 mm materials (Table 400.13) by mix in place method normal construction of granular sub base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method by Rotavator at once and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401 as per MORD Technical Soecification Clause 401 (Excluding GST)
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 2 as per MORD Technical Specification Clause 405 (Excluding GST)
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405 (Excluding GST)
Low porosity providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleanin of road surface and spraying primer @ 0.70 kg./sqm using mechanical means as per MORD technical specification clause 502 (Excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen distributor @ 0.30 kg / sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MORD technical specification clause 503 (Excluding GST)
Providing and laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal coat of Type C as per MORD Technical Specification Clause 508. (Excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - III TypeC (Excluding GST)
Brick edging on both sides of the road of first class bricks 8 cm (3") wide and 12 cm 4.5" deeps laid with mud mortar including labour and supply of bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by E-in-C. (Excluding GST)
Excavation in foundation in soil requring the use of special tools and plant such as pickaxes/sabbals etc. including lift up to 1.5m and lead up to 50m as (Excluding GST)
Stone Dust Filling in foundation trenches as per drawing and technical specification clause 305.3.9 (Excluding GST)
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 10 (Nominal mix 1:3:6) (Excluding GST)
Supply & Fixing & jointing of NP-3 Hume pipe 1000 mm dia (S&S Type) up to site. (Excluding GST)
Supply & Fixing & jointing of NP-3 Hume pipe 350 mm dia (S&S Type) up to site. (Excluding GST)
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix 1:2:4) (Excluding GST)
RCR Stone masonary work in cement mortar in foundation complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203. In 1:3 cement mortar (Excluding GST)
Pointing with cement mortar (1:3) on Stone work as per drawing and technical specification Clauses 613.3 and 1204 (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost)(But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00% Construction Cost) (But Excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
T2.pdf
Tender Documents • 0.51 MB
BOQ_2101117.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid