| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance COIMBATORE 18 TAMIL NADU | 18 | ₹1.3 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.4 Cr+₹6.7 L (5.00%)Rejected-Finance 44 82 LIG COLONY 1 MAHALINGAPURAM POLLACHI | COIMBATORE | TAMIL NADU | 638459 | ₹1.4 Cr+₹6.7 L (5.00%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S PARTHIBARAJAN L2 | ARTHI & CO L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 13,155 | m2 | 27.41 ₹3,60,578.55 | 26.1 ₹3,43,345.5 Lowest |
| 2.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 658 | m3 | 10,781.4 ₹70,94,161.2 | 10,268 ₹67,56,344 Lowest |
| 3.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 395 | m3 | 11,114.25 ₹43,90,128.75 | 10,585 ₹41,81,075 Lowest |
| 4.00 | GST 18% | 1 | No | 21,32,076.33 ₹21,32,076.33 | 20,30,537.61 ₹20,30,537.61 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
27 Jun 2025, 3:00 pmClosed
Commissioner Pollachi Municipality
Commissioner Pollachi Municipality
Restoration of BT Surface at VKR Street 076004R100 Jaykrishna Nagar 1 E W 076007R267 Rajarajeshwari Nagar E W 1st Cross Street 076007R384 Rajarajeshwari Nagar N S 5th Cross Street 076007R386 Various Places
2025_MAWS_570964_1
2031/2025/E1
Open Tender
Civil Works - Roads
Works
60 days
Pollachi Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.4 L
Pollachi Municipality
22 Aug 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
20 Jun 2025
Amount
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
S PARTHIBARAJAN (BID ID -1379709)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .