Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹15.4 L+₹26,474.38 (1.74%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹17.2 L+₹2.1 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹24.3 L
EMD Value
₹48,580
Closing Date
25 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Restoration of Wagay Mohalla Babagund road
2026_PWDJK_325231_4
NIT_No_92_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
Babagund
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer RnB Division Budgam
₹48,580
28 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil : | 113.35 | cum | 256.85 | ₹29,113.95 |
| 2 | Providing and laying of soling stone size over 150mm on level (hand packed) watering ramming complete under raft and flooring.. | 302.18 | cum | 1,200 | ₹3,62,616 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.67 | cum | 5,202.9 | ₹29,500.44 |
| 4 | Supply/filling of 2nd class Quarry stones hand packed Dry tightly in wire crates including ,tipping ,tightening and cost of carriages of stones and wire crates complete job. | 371.78 | cum | 5,400 | ₹20,07,612 |
stage.html
html • 0.02 MB
finance_1098533.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1098533.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .