Tender Value
₹42 L
EMD Value
₹4.1 L
Closing Date
30 Apr 2026, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Construction of Allahabad-Lucknow Road to Piranagar Sindhaur (1)
2026_CEALD_1140614_1
1675/93C-ETENDERING/PFC/2026 DT. 02.04.2026
Open Tender
Civil Works
150 days
PRATAPGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.1 L
Pratapgarh Circle, PWD, Pratapgarh
1 Jun 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m. transporting to site, spreading, grading to required slope and compacting to meet requirement of table No. 300.1 & 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5 The compacted thickness of each layer shall not be more then 200 mm. including Labour cess but excluding GST | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at O.M.C.and compacting with vibratory roller to achieve the desired density for Grading 1 as per MORD Specification complete as per clause 401 iincluding Labour cess and Royalty but excluding GST | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Water Bound Macadam Grading-II Providing, laying, spreading and compacting stone aggregates of 63-45 mm sizes to water bound macadam G-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 2 as per Technical Specification clause -405 (2)A including Labour cess and Royalty but excluding GST | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Water Bound Macadam Grading-III Providing, laying, spreading and compacting stone aggregates of 53-22.4 mm sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 3 as per Technical Specification clause -405(3)A including Labour cess and Royalty but excluding GST | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Brick edging on both side of the road of first Brick class M 150 8 cm wide and 12 cm deep laid with mud mortor including labour & supply of brick finished to required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the E/I. of the work including material, all labour, T&P etc. for proper completion of work. including Labour cess and Royalty but excluding GST | - | Km | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specification clause - 502(I) including labour cess but excluding GST | - | Sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Providing and applying tack coat with bitumen using bitumen VG-10 pressure distributor @ 0.35 Kg/Sqm. on the prepared bitumin surface cleaned with hydralic broom, As per MORD specification 503 including labour cess but excluding GST | - | Sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Providing, laying and rolling of open - graded premix surfacing of 20 mm compacted thickness with 13.2 mm crushed stone grit @ 0.18cum/10sqm and 11.2 mm size crushed stone grit @ 0.09cum/10sqm from approved quarry and bitumen VG-10 @ 1.46Kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, mixing in a suitable plant or by mixall, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades, including cost of material, labour, plant, machinery and T&P including complete as per MORD Specification No.508(II) including Labour cess and Royalty but excluding GST | - | Sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and laying seal coat type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.5 mm crushed stone grit @ 0.09cum/10sqm from approved quarry and bitumen @ 0.65kg/sqm including cost of material, labour, plant, machinery, mixall and T&P including labour etc. complete as per MORD Specification No.510(ia) including Labour cess and Royalty but excluding GST | - | Sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Construction Of Subgrade and Earthen Shoulers with approved material obtained from borrow pits with all lift and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table No. 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 The compacted thickness of each layer shall not be more then 200 mm. including Labour cess but excluding GST | - | Cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_2130025.xls
BOQ • 0.31 MB
T_21.pdf
Tender Documents • 7.94 MB
Download all tender documents and submit your bid