Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 LAccepted-AOC VEERAGANUR | ₹12.4 L | 1 | Accepted-AOC Work Order |
| 2 | 2₹12.4 LRejected-Finance | ₹12.4 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Sri Ayyanar Construction L2 | VENKATACHALAM RAMASAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 35 | M3 | 264 ₹9,240 | 263.5 ₹9,222.50 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 13 | M3 | 5,870 ₹76,310 | 5,869 ₹76,297 |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 28 | M3 | 423 ₹11,844 | 421 ₹11,788 |
| 4.00Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 gauge stiffened with welded M.S. angle of 25 x 25 x 3mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10 cm to 13 cm dia spaced at not less than 75 cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (The payment for centering shall be made only after the concrete is laid. The retrieved materials should be taken back by the contractor) | |||||
| 4.01 | Column | 65 | M2 | 1,247 ₹81,055 | 1,246.5 ₹81,022.50 |
| 4.02 | Grade Beam | 32 | M2 | 576 ₹18,432 | 575 ₹18,400 |
| 5.00 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards | 13 | M3 | 8,365 ₹1.1 L | 8,365 ₹1.1 L |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 1,950 | Kg | 94 ₹1.8 L | 92.9 ₹1.8 L |
| 7.00 | Brick work in following Cement Mortar using best quality of II Class ground mould chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for foundation and basement including curing, etc., complete complying with standard specifiction. | 13 | M3 | 7,727 ₹1.0 L | 7,726 ₹1.0 L |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 95 | M2 | 297 ₹28,215 | 295 ₹28,025 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
5 Mar 2026, 3:00 pmClosed
EXECUTIVE OFFICER
9, Attur Main Road, Veeraganur Post, Gangavalli Tk, Salem Dt.
Construction of Play Ground Stage at Ward No.10 Near Moopanar Kovil in Veeraganur Town Panchayat
2026_DTP_669326_1
121(2)/2026
Open Tender
Civil Works - Others
30 days
VEERAGANUR TOWN PANCHAYAT
Enclosed
1 document required · 1 mandatory
₹0
₹30,000
1 Apr 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 gauge stiffened with welded M.S. angle of 25 x 25 x 3mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10 cm to 13 cm dia spaced at not less than 75 cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (The payment for centering shall be made only after the concrete is laid. The retrieved materials should be taken back by the contractor)
Column
Grade Beam
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Brick work in following Cement Mortar using best quality of II Class ground mould chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for foundation and basement including curing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing of M.S.grill of approved design for grill gate, grill work to doors and windows openings ramp etc., using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc., complete complying with standard specification.
Supplying and fixing by drilling holes and not by puching for Roofing with pre painted Galvalum sheet of 0.47mm thick of best approved quality with required size with curved shape and white ridge sheet with necessary bolts and nuts bitumen washers, including cutting the sheet to the required size found necessary during execution etc., Complete complying with standard specifications. [The sheet should be got approved by the Engineer incharge before use on works]
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface ect., complete complying with standard specification and as directed by the departmental officers
Painting two coats over new iron works with Enamel paint of approved colour and quality including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specification
Paving the floor with best quality Double Charged Vitrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Paving the floor with ceramic anti-skid tiles (Required shape and design) of 6mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three m sand) 6mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg/sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Manufacturing Supplying and fixing of stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless steel pipe of 1.60m thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00m thick as vertical at horizontal stainless steel pipe of 1.60mm thick in between, the vertical pipe has to be welded to the 100x100x6mm MS base plate encased in the base cincrete. The rate is inclusive of of the charges for cutting, bending, welding, grinding, polishing, conveyance, eletrical charges,ect, complete complying with standard specification.
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by Manual means
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804241.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_804241.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid