| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Fee/PreQual/Technical/Finance AT GOBINDPUR P O P S SAILO GOVINDPUR DIST CUTTACK PIN 754003 | CUTTACK | CUTTACK | ODISHA | 754003 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.0 L+₹7,403.40 (1.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.0 L+₹10,028.24 (2.04%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.4 L+₹47,785.57 (9.74%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹5.4 L+₹47,785.57 (9.74%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.7 L
EMD Value
₹6,730
Closing Date
15 Oct 2026, 5:00 pmClosed
Divisional Officer
At.-REO Colony, P.O.-Nayabazar, Dist.-Kataka
S/R to Tahashil office at Kantapada for the year 2026-27
2026_CERWI_143155_1
RWD Ctc-14/2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Cuttack
Refer tender document
2 documents required · 2 mandatory
₹4,000
₹6,730
Yes
16 Oct 2026
10 Oct 2026
16 Oct 2026
10 Oct 2026
15 Oct 2026
10 Oct 2026
10 Oct 2026 - 14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling and removing doors, windows and ventilators including removing the frames hinges fastening and stacking the same for reuse and refixing them after necessary repair etc. complete as per specification and direction of the Engineer-in-Charge. | 12.78 | sqm | 465.14 | ₹5,944.49 |
| 2 | Earth work in excavation of foundation in hard soil including dressing of sides and levelling the bed upto the required depth and depositing the excavated materials away from the work site within 50mm initial lead & 1.5m intitial lift including cost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. | 30.22 | cum | 282.88 | ₹8,548.63 |
| 3 | Providing and filling in foundation and plinth with sand including watering & ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount and cost of labour, T&P, etc. required for the work complete as per specification & direction of the Engineer-in-charge. | 5.64 | cum | 530.54 | ₹2,992.25 |
| 4 | Providing and laying of cement concrete of prop. (1:3:6) using 4cm size black hard granite crusher broken stone aggregate including watering, curing and ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. | 4.45 | cum | 6,516.79 | ₹28,999.72 |
| 5 | R.C.C of design mix M-25 having minimum cube strength of 250Kg./sqcm. on 150mm. cube at 28 days with clean crusher broken hard granite chips of 20mm and downgraded size of approved quality from approved quarry using minimum quantity of cement as per clause 303.5 of IRC-21/2000 & IS-456/2000 including hoisting,lowering & laying concrete in layers not exceeding 15cm in thick to the required thickness & compacting each layer by means of vibrator as per direction of the Engineer-in-Charge including watering & curing for 28 days including water tight shutterng & finishing the exposed surface smooth, providing grooves & beads where necessary with working of pumps, dewatering if required & other T&P machineries as may be required for the work including cost, conveyance royality of all materials with all leads and lifts required for the work complete in all respect including cost of all labour but excluding cost, conveyance of MS/Tor Steel labour for straightening, cutting, bending, binding & tying the grills & placing in proper position as per specification & approved drawing(to be paid separately as required for R.C.C. works)
a). Column | 3.95 | cum | 7,325.73 | ₹28,936.63 |
| 6 | b). Column Superstructure | 2.75 | cum | 16,706.12 | ₹45,941.83 |
| 7 | c). Plinth Band | 2.12 | cum | 7,325.73 | ₹15,530.55 |
| 9 | Cutting, straightening coiled or bent up M.S. rods, HYSD steel or Tor Steel of grade Fe-500-D confirming to I.S.-1786 - 1985 welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading of M.S. rods, HYSD steel or Tor steel and binding wires of 18 to 20 gauge required for the work including cost of all materials, labour charges, sundries, T&P etc. and scaffolding complete in all respect as per specification and direction of the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod or HYSD steel or Tor steel & binding work consumed in the work) | 6.64 | qtl | 8,913.26 | ₹59,184.05 |
| 10 | Laterite stone masonary in cement mortor (1:6) in foundation and plinth using well dressed laterite stones of approved size and quality from approved quarry after immersing the stone for 6 (Six) hours in water before use including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, royalties of all materials, cost of all labour, scaffolding, sundries, T&P etc. required for the works complete in all respect as per specification and direction of Engineer-in-charge
a). Using old stone | 7.04 | cum | 4,374.75 | ₹30,798.24 |
| 11 | b). Using New Stone | 7.04 | cum | 6,307.5 | ₹44,404.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_613332.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .