Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
19 Sept 2020, 12:00 pmClosed
S.E. EDC-1 MORADABAD
MORADABAD
Work of replacement of bushing rod, gasket etc of 10 MVA power transformer installed at Thakurdwara town substation under EDD-3 Moradabad.
2020_PVVNL_508745_1
29/2020-21/EDC1M
Open Tender
Electrical Works
Lump-sum
30 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
S.E. EDC-1 MORADABAD
₹2,000
22 Sept 2020
7 Sept 2020
21 Sept 2020
7 Sept 2020
19 Sept 2020
7 Sept 2020
Amount
Opening of jumpers from 10 MVA transformer no.2, cutting of damaged leed approx 30 cms and again lugging each jumpers total 03 nos for LV side connecting, bolting and tightening of jumper with "L" pieces and proper clamping of cables complete work as per norms.
Opening of HV, LV and neutral side bushing connection of 10 MVA transformer, replacement of 03 nos damaged bushing rods (Top side spiral broken and melted) and drain out of transformer oil form main tank to empty oil tank complete work as per norms.
Removing of dameged Gasket of HV/LV/Nutral side bushing, radiators air, releasing plug, OTI, WTI, MOG. Replacement of new gasket & its fixing after proper cleaning complete work as per norms.
Replacement of Gasket of main top cover and radiator with new gasket & its fixing after proper cleaning complete work as per norms.
Scrubing, rubbing & cleaning of transformer and body. Arrenging of silica gel, breather and filling them along with silica gel and oil pot. Arraengement of protection indication board (Low-oil, WTI & GAS form indicator) complete work as per norms.
Providing & replacement of damage LT side bushing complete work.
Centrifuging of power transformer oil installed at substation complete work as per norms.
P&H Engineering
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .