Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
28 Jul 2026, 3:00 pm
General Manager Zone-3 UPPCL Lucknow
Office of the General Manager Zone-3 UPPCL Lucknow
Construction of Balance Work of Residential and Non-Residential Building at Fire Station Naugarh Distt. Siddharth Nagar
2026_UPPRC_1168891_1
23/GM-3/UPPCL/2026-27 DATE-13.07.2026
Open Tender
Civil Works - Buildings
270 days
Siddharthnagar
As per Bid Documents
2 documents required · 2 mandatory
₹17,700
₹4.9 L
14 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ADMIN BUILDING, TYPE-4 RESIDENCE,TYPE-1 RESIDENCE SPL, TYPE-1 RESIDENCE , RAIN WATER HARVESTING,INTERLOCKING WORK , BOUNDARY WALL ,MAIN GATE ,SMALL GATE ,C.C ROAD,SEPTIC TANK& SOAPIT TANK ,HAUJ WASHING LINE ,PUMP ROOM ,SUMMERSABLE PUMP WITH BORING , & ELECTRICAL WORK AND PLUMBERING WORK ETC | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 640.48 | CUM | 181.75 | ₹1,16,407.24 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 172.91 | CUM | 489.12 | ₹84,573.74 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 25.42 | CUM | 1,482.91 | ₹37,695.57 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 162.53 | CUM | 4,756.48 | ₹7,73,070.69 |
| 6 | aaa | 30 | CUM | 5,501.16 | ₹1,65,034.8 |
| 7 | Making apron(with Drain & other )analysis | 102.91 | Rm | 760.88 | ₹78,302.16 |
| 8 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external perimeter of binding expansion joints, surroundings of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 (Part II 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chlordance will be used. The rate of application of chemical emulsion shallbe as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contract with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth. filling 5 litres per sqm (4)Treatment of soil along externalperimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/ sqm. | 167.32 | SQM | 216.49 | ₹36,223.11 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Lintel. | 16.63 | CUM | 8,033.72 | ₹1,33,600.76 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). slabs | 79.57 | CUM | 8,033.72 | ₹6,39,243.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.63 MB
BID_DOC.pdf
Tender Documents • 12.95 MB
BOQ_2193395.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid