| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.5 LAccepted-AOC | ₹10.5 L Quoted ₹16.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹17.2 LRejected-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹17.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SWETHA ENTERPRISES L1 | CKEE ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for removal of field shortage by snapping of field emitting electrodes and normalizing the field | 20 | Field | 62,340 ₹73,561.20 | 65,700 ₹77,526 |
| 2.00 | Charges for removal of field shortage by repositioning of displaced collecting plate at the top and normalizing the field. | 24 | Field | 69,240 ₹81,703.20 | 72,960 ₹86,092.80 |
| 3.00 | Charges for removal of field shortage by repositioning the collecting plate at the bottom and tag welding the wornout portion of the collecting plate with a piece and normalizing the field. | 30 | Field | 1,48,590 ₹1.8 L | 1,56,600 ₹1.8 L |
| 4.00 | Charges for reconditioning/replacing worn out/bent shock bar guides both front and rear wherever necessary | 10 | Set | 28,090 ₹33,146.20 | 29,610 ₹34,939.80 |
| 5.00 | Charges for replacing of defective shaft insulator by a new one after releasing of gear box and refitting on completion of work in one field. | 2 | No. | 6,858 ₹8,092.44 | 7,228 ₹8,529.04 |
| 6.00 | Charges for releasing the rapping mechanism gear box, dismantling the coupling, transporting the gear box to office store and transporting the new or reconditioned gear box from store or office store to workspot and assemble the same | 12 | No. | 77,736 ₹91,728.48 | 81,924 ₹96,670.32 |
| 7.00 | Charges for cleaning of ash accumulated ash inside the ESP hopper | 30 | No. | 53,850 ₹63,543 | 56,760 ₹66,976.80 |
| 8.00 | Charges for overhauling of defective rapping motor gear box and testing | 16 | No. | 1,03,376 ₹1.2 L | 1,08,944 ₹1.3 L |
| 9.00 | Charges for removal of the ash accumulated in the collecting and emitting rapping gear boxes, arresting of oil leakage if any, removal of oil spillage, top up of oil and removal of foreign material in that area in one Unit ESP | 32 | Time | 1,07,328 ₹1.3 L | 1,13,120 ₹1.3 L |
| 10.00 | Opening all the manhole doors in 7.5 mtr. and roof top of ESP, Mechanical cleaning and water washing the fields in ESP including collecting plates, emitting electrode rapping mechanism and structures inside the ESP and ESP hoppers, and closing all the manhole doors including the cost of asbestos ropes for doors completely. | 4 | No. | 1,54,940 ₹1.8 L | 1,63,288 ₹1.9 L |
Tender Value
Refer Docs
EMD Value
₹11,100
Closing Date
9 Jan 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I II III Attending Breakdown works in Unit I II III ESP for the period from 01 04 2026 and upto 31 03 2027
2025_EB_636257_1
CE/TTPS/SE/M-II/No.54/2026-27
Open Tender
Miscellaneous Works
365 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹11,100
Yes
23 Mar 2026
24 Dec 2025
12 Jan 2026
24 Dec 2025
9 Jan 2026
24 Dec 2025
Charges for removal of field shortage by snapping of field emitting electrodes and normalizing the field
Charges for removal of field shortage by repositioning of displaced collecting plate at the top and normalizing the field.
Charges for removal of field shortage by repositioning the collecting plate at the bottom and tag welding the wornout portion of the collecting plate with a piece and normalizing the field.
Charges for reconditioning/replacing worn out/bent shock bar guides both front and rear wherever necessary
Charges for replacing of defective shaft insulator by a new one after releasing of gear box and refitting on completion of work in one field.
Charges for releasing the rapping mechanism gear box, dismantling the coupling, transporting the gear box to office store and transporting the new or reconditioned gear box from store or office store to workspot and assemble the same
Charges for cleaning of ash accumulated ash inside the ESP hopper
Charges for overhauling of defective rapping motor gear box and testing
Charges for removal of the ash accumulated in the collecting and emitting rapping gear boxes, arresting of oil leakage if any, removal of oil spillage, top up of oil and removal of foreign material in that area in one Unit ESP
Opening all the manhole doors in 7.5 mtr. and roof top of ESP, Mechanical cleaning and water washing the fields in ESP including collecting plates, emitting electrode rapping mechanism and structures inside the ESP and ESP hoppers, and closing all the manhole doors including the cost of asbestos ropes for doors completely.
Charges for cleaning the stair case, collecting rapping mechanism platform, emitting rapping mechanism platform at Unit-I, II & III ESP including consumables
Charges for removal of the scrap materials and ash accumulated below and around ID,FD and PA Fans floor area of Unit-I, II & III & transporting and devolution of scrap materials to stores and disposal of ash including cost of consumables
Charges for cutting and dismantling the existing wornout structurals supports, hand rails, platform & ladders etc., from Unit ESP and transporting the same to stores and devolution.
Charges for fabrication and erection of structurals supports, hand rails, platform & ladders etc., in Unit ESP
CKEE ENGINEERING PRIVATE LIMITED (BID ID -1557916)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_761403.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid