Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance B 9 73 SECTOR 18 ROHINI NORTH WEST DELHI DELHI 110089 | NORTH WEST DELHI | DELHI | 110089 | L1 | Admitted-Finance | |
| 2 | L2₹4.0 L+₹1.0 L (33.4%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.8 L+₹1.7 L (57.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L3₹4.8 L+₹1.7 L (57.4%)Admitted-Finance SHOP NO 55 GROUND FLOOR ROHINI SECTOR 7 NAHARPUR FLOOR HARLAL MARKET NAHARPUR SECTOR 7 DELHI OPP GOYAL GARMENTS VILLAGE TOWN DELHI CITY DELHI | L3 | Admitted-Finance | |
| 5 | L3₹4.8 L+₹1.7 L (57.4%)Admitted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HYDROCON ENGINEERS L3 | Goodwill Enterprises L3 | arun engineers and contractors L4 | DEV ENGINEERS L2 | Shiva Buildtech L1 | MITTAL TRADING COMPANY L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Hiring and continuous operation of a 25 HP sewage dewatering pump-set trolley, having a duty Head: 12-15 Mtr, Discharge: 270-300 Cubic Mtr/Hr with Pump Nozzle (Suction: 125mm x Delivery: 100mm). The setup must include the installation of necessary accessories such as Non-Return Valves (NRVs), sluice valves, bends, flanges, and an MS suction line properly lowered into the sump-well, conforming to the site depth with approximately 125-150 meters or as per site requirement of MS delivery pipeline or other suitable pipeline is to be laid from the pump delivery point to the nearest receiving manhole. This includes all required consumables such as nuts, bolts, washers, rubber packing, and execution activities like welding and alignment. In case the pipeline crosses a road, road cutting using hammer machines or JCBs shall be carried out as required, followed by proper reinstatement. Barricading with DJB-labeled warning boards shall be placed at all working locations to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels (if any), and provide shelter to operating staff. Round-the-clock staffing is to be ensured with deployment of one Semi-Skilled and one Unskilled worker per shift (three shifts per day) for continuous monitoring and operation. The duties of the deployed staff shall include the operation of the pump-sets, general watch and ward, dewatering of sewage along with floating waste (kachra), cleaning of pump impeller, removal of sludge/silt, and maintenance of hourly log-sheets for the operation of pump-sets and DG sets as per the direction of the Engineer-in-Charge.
Note: The entire sewage trolley setup shall consist of two 25 HP pump-sets—one running and one standby—to ensure uninterrupted pumping for 24 hours a day. Electricity required for running the pump-sets shall be provided by the department as per site conditions.
Period: 90 Days x 3 Shift = 270 Shifts | 270 | Shifts | 4,03,380 ₹4,75,988.4 | 4,03,380 ₹4,75,988.4 | 4,80,600 ₹5,67,108 | 4,03,380 ₹4,03,380 | 3,02,400 ₹3,02,400 Lowest | 4,03,380 ₹4,75,988.4 |
Tender Value
Refer Docs
EMD Value
₹13,800
Closing Date
16 Sept 2025, 3:00 pmClosed
EX. ENGINEER (E AND M) M-IX
OFFICE OF THE EX. ENGINEER (E AND M) M-IX
Installation of sewage trolley on hiring basis at Nawada housing complex near metro pillar no. 792..(Re-Invited)
2025_DJB_277986_1
e-NIT No.11 / (EnM)M-VIII/ 2025-26
Open Tender
Civil Works
Works
90 days
OFFICE OF THE EX. ENGINEER (E AND M) M-IX
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Account No. 50448339804
₹13,800
20 Sept 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
Hiring and continuous operation of a 25 HP sewage dewatering pump-set trolley, having a duty Head: 12-15 Mtr, Discharge: 270-300 Cubic Mtr/Hr with Pump Nozzle (Suction: 125mm x Delivery: 100mm). The setup must include the installation of necessary accessories such as Non-Return Valves (NRVs), sluice valves, bends, flanges, and an MS suction line properly lowered into the sump-well, conforming to the site depth with approximately 125-150 meters or as per site requirement of MS delivery pipeline or other suitable pipeline is to be laid from the pump delivery point to the nearest receiving manhole. This includes all required consumables such as nuts, bolts, washers, rubber packing, and execution activities like welding and alignment. In case the pipeline crosses a road, road cutting using hammer machines or JCBs shall be carried out as required, followed by proper reinstatement. Barricading with DJB-labeled warning boards shall be placed at all working locations to ensure public safety. The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels (if any), and provide shelter to operating staff. Round-the-clock staffing is to be ensured with deployment of one Semi-Skilled and one Unskilled worker per shift (three shifts per day) for continuous monitoring and operation. The duties of the deployed staff shall include the operation of the pump-sets, general watch and ward, dewatering of sewage along with floating waste (kachra), cleaning of pump impeller, removal of sludge/silt, and maintenance of hourly log-sheets for the operation of pump-sets and DG sets as per the direction of the Engineer-in-Charge. Note: The entire sewage trolley setup shall consist of two 25 HP pump-sets—one running and one standby—to ensure uninterrupted pumping for 24 hours a day. Electricity required for running the pump-sets shall be provided by the department as per site conditions. Period: 90 Days x 3 Shift = 270 Shifts
DEV ENGINEERS (BID ID -1620282)
HYDROCON ENGINEERS (BID ID -1619769)
MITTAL TRADING COMPANY (BID ID -1620088)
Goodwill Enterprises (BID ID -1620090)
arun engineers and contractors (BID ID -1620184)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .