| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.3 LAccepted-Finance HIMACHAL PRADESH HP | ₹53.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹55.5 L+₹2.3 L (4.29%)Rejected-Finance R O VILLAGE AJOG P O PURTHI TEHSIL PANGI DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | ₹55.5 L+₹2.3 L (4.29%) | L2 | Rejected-Finance L2 |
| 3 | L3₹61.4 L+₹8.1 L (15.2%)Rejected-Finance | ₹61.4 L+₹8.1 L (15.2%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical HOUSE NO 114 WARD NO 1 KRISHNA NAGAR TEH AND DISTT HAMIRPUR H P | - | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹63.4 L
EMD Value
₹1.3 L
Closing Date
20 Apr 2026, 11:00 amClosed
EXECUTIVE ENGINEER KILLAR DIVISION HPPWD KILLAR
EXECUTIVE ENGINEER KILLAR DIVISION HPPWD KILLAR
Construction of Building Portion, Water Supply and Sanitary Installation, C/O Septic Tank and Soak Pit and C/O Boundary Wall and Gate and Side Wall in Random Rubble Masonry
2026_PWD_134289_1
KILLAR DIVISION
Open Tender
Civil Works - Buildings
Percentage
547 days
Killar
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹1.3 L
10 Jul 2026
14 Apr 2026
20 Apr 2026
14 Apr 2026
20 Apr 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Filling in plinth with sand under floors including watering, ramming consolidating and dressing complete as per HPPWD specifications, approved Drawings,design, to the entire satisfaction and direction of Engieer in charge including hauling carriage of materials to various location through all modes of transporation within all leads, lifts and other incidental complete in all respect. The rate inclusive of GST,octri,royalty,malkana and all type of texes imposed by the Govt. | - | Per Cubic metre | - | - |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platform including all taxes, GST,carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. | - | Per square Metre | - | - |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing, basis of columns etcetra and mass concrete within all leads and lifts and as per the direction of the Engineer-in-charge and other incidentals. | - | Per square Metre | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, pillars, posts and struts square rectangular or polygonal in plan including all taxes, GST, carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. | - | Per square Metre | - | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for stair cases with slopping or stepped soffit including riser and stringers excluding landing floor including all taxes, GST, carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. | - | Per square Metre | - | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights from floor including all taxes, GST, carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. | - | Per square Metre | - | - |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for vertical and horizontal fins individually or forming box louvers band, facias and eaves board including all taxes, GST,carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. | - | Per square Metre | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls upto all width and heights including all taxes,GST, including carriage of material and other incidentals within all leads and lifts and as per the direction of the Engineer-in-charge. | - | Per Running metre | - | - |
| 1.09 | Stone filling in plinth with approved quality under floor including watering, ramming, consolidating and dressing complete.as per specifications, approved drawing, design, as per entire satisfaction and direction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkhana, toll tax, sale tax, GST or any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 1.1 | Providing and laying cement concrete work 1:2:4 (one cement : two sand : four graded stone aggregate 20mm(Teenty milimetre) nominal size including mechanically mixing and vibrating (M-20 Grade) excluding the cost of form work and reinforcement for RCC work in:- Foundation footings bases of columns and the like and mass concrete including all leads and lifts.as per HPPWD specifications,approved Drawing,design, as per the entire satisfaction and direction of Engieer in charge including carriage of material within all leads lifts and other incidentals the rate inclusive of octri,royalty,malkana and all type of texes imposed by the Govt. | - | Per Cubic metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
DNIT.pdf
Tender Documents • 3.39 MB
BOQ_198583.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .