Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC 599H C 4 CHINNAPPA LAYOUT PONNAR SANKAR ILLAM NEAR BALA GAS AGENCY BHAVANI ERODE DT TAMIL NADU 638301 | ERODE | TAMIL NADU | 638301 | ₹5.4 Cr Quoted ₹5.7 Cr | L1 | Accepted-AOC Quoted less percentage |
| 2 | L2₹5.8 Cr+₹16.2 L (2.86%)Rejected-AOC | ₹5.8 Cr+₹16.2 L (2.86%) | L2 | Rejected-AOC Quoted above percentage |
Tender Value
₹5.4 Cr
EMD Value
₹2.8 L
Closing Date
30 Jun 2020, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance, Salem Circle
Widening, Improvements to Government Roads including Junction and Curve Improvements, CD and Construction Works and Up keeping for a period of 60 months in Sankari (H) Sub Division (Package-34)
2020_HWAY_165467_1
TN.2/2020-21/HDO, Dt.23.05.2020-11
Open Tender
Civil Works - Roads
Percentage
210 days
Edappady
Refer tender document
3 documents required · 3 mandatory
₹0
₹2.8 L
13 Oct 2020
30 May 2020
2 Jul 2020
30 May 2020
30 Jun 2020
10 Jun 2020
3 Jun 2020 - 9 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Sumathy D Created Date/Time: 15-Jul-2020 11:27 AM Tender Title: Edappady Package 34 Tender ID: 2020_HWAY_165467_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Widening, Improvements and Improvements to Riding Quality to Government Roads including Junction and curve improvements, CD and construction works and upkeeping for a period of 60 months in Sankari (H) C &M,Sub Division (Package-34) The Following works are involved in this package 1.Junction improvement at km 2/4 & 2/6 of Sankari - Mecheri road (via) Edappady and including Curve Improvements at km 0/10, 2/4, 2/6 & 6/8 01-CRIDP-20-21-S-0491 2.Improvements of Magudanchavadi - Komarapalayam road (via) Edappady at km 5/8 - 6/2 and 6/6 - 7/2 including upkeeping for a period of 60 months 01-CRIDP-20-21-S-0483 3.Widening from SL to IL and Improvements of Alathur - Reddipalayam - Thevur road at km 7/0 - 8/0 including CD Works inluding upkeeping for a period of 60 months 01-CRIDP-20-21-O-3474 4.Widening from SL to IL and Improvements of Alathur - Reddipalayam - Thevur road at km 8/0 - 9/2 including Construction of retaining wall at Km 9/2 and CD Works inluding upkeeping for a period of 60 months 01-CRIDP-20-21-O-3475 5.Widening from SL to IL and Improvements of Alathur - Reddipalayam - Thevur road at km 9/2 - 10/2 including Construction of retaining wall at Km 9/4 & 9/8 and CD Works inluding upkeeping for a period of 60 months 01-CRIDP-20-21-O-3476 6.Construction of Retaining wall at km 2/8-3/2 of Annamar Kovil - Poomaniyur road 01-CRIDP-20-21-O-3531 7.Construction of drain at km 2/8 & 8/8 of Annamar Koil Road - Poomaniyanoor Road 01-CRIDP-20-21-O-3503
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SriRanganathar constructions private limited 48149768.590 5.000 56624128.000 Five Crore Sixty Six Lakh Twenty Four Thousand One Hundred and Twenty Eight
2.00 M/s.T.P.S. Construction Company 48149768.590 8.000 58241961.000 Five Crore Eighty Two Lakh Fourty One Thousand Nine Hundred and Sixty One
Lowest Amount Quoted BY: SriRanganathar constructions private limited(56624128.000)
BOQ Summary Details Tender Title: Edappady Package 34 Tender ID: 2020_HWAY_165467_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SriRanganathar constructions private limited 56624128.000 L1
2 M/s.T.P.S. Construction Company 58241961.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .