Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹12.0 CrAccepted-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹12.0 Cr | 1st | Accepted-AOC 1st |
| 2 | 2nd₹13.2 CrRejected-AOC 279 A 22 SONIPAT ROAD ROHTAK 124001 HARYANA | ROHTAK | ROHTAK | HARYANA | 124001 | ₹13.2 Cr | 2nd | Rejected-AOC 2nd |
| 3 | 3rd₹12.6 CrRejected-AOC 858 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹12.6 Cr | 3rd | Rejected-AOC 3rd |
| 4 | 4th₹13.9 CrRejected-AOC 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS | PANIPAT | HARYANA | 132103 | ₹13.9 Cr | 4th | Rejected-AOC 4th |
Tender Value
₹11.7 Cr
EMD Value
₹23.4 L
Closing Date
7 Apr 2023, 3:00 pmClosed
SANJEEV KUMAR TYAGI
EE PHE Division No. 1 Hisar
Siswal Providing sewerage system in village Siswal District Hisar Construction of Pumping station RCC Collecting Tank Screening chamber 2.50 MLD Construction of 1 STP SBR technology Masonry Boundary wall Construction 2 nos staff RCC C
2023_HRY_270182_1
20230C61262F BAAA 4D78 BD3C D2A2C9DB448F564PUH
Open Tender
Civil Works
365 days
SISWAL
3 documents required · 3 mandatory
₹20,000
Yes
₹23.4 L
Yes
14 Jul 2023
31 Mar 2023
7 Apr 2023
31 Mar 2023
7 Apr 2023
31 Mar 2023
31 Mar 2023 - 7 Apr 2023
Amount
RCC PIPE WITH HDPE LININGIN SIDE: Providing lowering in trenching to correct gradient and alignment, jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS code 458:2003 into trences for all depths and laying out the same to correct alignment, gradient levels etc. cutting of concrete beds and jointing holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and untill the surrouding benchings, haunches and envelopes are completed. The pipe shall rest on beds at all joints through their lengths and to ensure this, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer incharge including all cartge etc. complete in all respect. 450 mm i/d pipe with inside HDPE lining.
Operation and Maintenance of Sewerage Network complete scope of work mentioned in the DNIT Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Jai Shree Balaji Constn Co.(GSTN-06AKLPK7500N1ZV)
M/S SHREE BALAJI BUILDERS(GSTN-NA)
kapil engineering company(GSTN-NA)
Rajesh Kadiyan Contractor(GSTN-NA)
kapil engineering company
M/S SHREE BALAJI BUILDERS
Jai Shree Balaji Constn Co.
M/S SHREE BALAJI BUILDERS
kapil engineering company
Jai Shree Balaji Constn Co.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid