| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.0 LAccepted-AOC DADRA AND NAGER HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹80.3 L+₹5.3 L (7.08%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹80.3 L+₹5.3 L (7.09%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹77.2 L
EMD Value
₹1.5 L
Closing Date
15 Oct 2020, 12:30 pmClosed
EXECUTIVE ENGINEER PWD WD II DIU
EXECUTIVE ENGINEER PWD WD II FORT ROAD DIU
Providing and fixing metal Crash Barrier and CC Kerb stone on new road from Nagoa Junction to Nagoa Beach to Khodidhar Beach to Gomti Beach road upto main road at Nagoa, Diu.
2020_DIUDT_1104_1
e-Tender Notice No. 29/2020-2021
Open Tender
Civil Works - Others
Works
120 days
DIU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE ENGINEER PWD WD II DIU
₹1.5 L
Yes
11 Jan 2021
6 Oct 2020
15 Oct 2020
6 Oct 2020
15 Oct 2020
6 Oct 2020
Civil Works :
Type - A, "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 meter lead. (A) Loose or soft soil.
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 meter lead. (E) Hard Rock
Filling in foundation and plinth with rubble soiling Stone in layers of 20cm thick. Thickness incl. watering, ramming and consolidation.etc complete
Providing and laying cement concrete 1:2:4 (1- Cement: 2 - Coarse sand:4-graded stone aggregate 20mm Nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth.
Providing formwork with sheating of steel sheets so as to give a fair finish including centering, shuttering, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (A) Foundations footings Bases of Coloumns etc. and Mass concrete.
Applying priming coat over new steel and other meta; surface after and including preparing the surface by throughly cleaning, oil, grease, dirt and other foreign matter and scoured with brushes fine steel wood, scrapers and sand paper with ready mixed priming paint brushing red lead.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint, brushing interior to give an even shade including cleaning the surface an even shade including cleaning the surface of all dirt, dust and other foreign matter. as per the pattern as directed by Engineer-in-charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete of size 600 x 300 s 1500 with half Battle (HB) of VYARA make or equivalent in position to the required line, level and curvature, jointed with cement mortar 1:3 (1-cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (lenght of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
SKYWAY ENTERPRISE
SUPER CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .